You are here

Metric: 3.3 Total Purchased Clean Energy

Project Metrics

3.3 Total Purchased Clean Energy (Tracked by Fiscal Year)

Annotations

  • FY 2008:

    Baseline

  • FY 2009:

    Production started at BIF

  • FY 2014:

    Production started at BRC

  • FY 2016:

    Production started at the Wassaja and Solar Farm

  • FY 2017:

    PPA signed with RainSplitter Wind Farm

Tracking

Value Applicable Date Affirmed By Annotation
7,272.33 Jun 30 2017 Sarthak Prasad

PPA signed with RainSplitter Wind Farm

3,908.07 Jun 30 2016 Sarthak Prasad

Production started at the Wassaja and Solar Farm

51.00 Jun 30 2015 Sarthak Prasad
53.04 Jun 30 2014 Sarthak Prasad

Production started at BRC

40.98 Jun 30 2013 Sarthak Prasad
41.35 Jun 30 2012 Sarthak Prasad
43.35 Jun 30 2011 Sarthak Prasad
43.37 Jun 30 2010 Sarthak Prasad
12.06 Jun 30 2009 Sarthak Prasad

Production started at BIF

0.00 Jun 30 2008 Sarthak Prasad

Baseline

Metric Topic

Tracking Date Type

Fiscal Year [July - June]