You are here

Objectives Dashboard [OLD]

NOTE: this page has been superseded by a new Objectives Dashboard. Please refer to that page for the latest information. This page may be removed at a future date.

The 2015 Illinois Climate Action Plan (iCAP) provides a strategic plan for achieving the Climate Leadership Commitments, including being carbon neutral no later than 2050.  There are several specific objectives defined in the 2015 iCAP, and each objective has a related Project on this portal.  The dashboard below links iCAP Objectives to key performance metrics and the related Project.

Theme Objective Metric
Theme: Zero Waste 5.5 Plan for Organic Waste

Tons of pre- and post-consumer food scraps diverted via Grind2Energy

Theme: Engagement 7.6 iCAP Portal Updates

iCAP Portal users per year

Annotations

  • FY 2021:

    during covid pandemic

Theme: Reporting Progress 1.0 iCAP 2020 Illinois Climate Action Plan
Theme: Reporting Progress 1.0 2015 Illinois Climate Action Plan
Theme: Energy 2.1 Net-Zero Space
No metric specified for this objective
Theme: Energy 2.2 Improve standards for new building and renovations
No metric specified for this objective
Theme: Energy 2.3 Strengthen Centralized Conservation Plan

Percent Reduction in Energy Use Intensity

Theme: Energy 2.4 Engage and incentivize the campus community
No metric specified for this objective
Theme: Energy 3.1 Explore Options for 100 Percent Clean Campus Energy
No metric specified for this objective
Theme: Energy 3.2 Expand On-Campus Solar Energy Production

Solar Energy Generation on Campus

Annotations

  • FY 2008:

    iCAP baseline year

  • FY 2009:

    Production started at BIF

  • FY 2014:

    Production started at BRC

  • FY 2016:

    Production started at Wassaja and Solar Farm 1.0

  • FY 2019:

    Production started at ECE

  • FY 2021:

    Production started at Solar Farm 2.0 and Conference Center

Theme: Energy 3.3 Expand the Purchase of Clean Energy

Total Purchased Clean Power

Annotations

  • FY 2008:

    Baseline

  • FY 2009:

    Production started at BIF

  • FY 2014:

    Production started at BRC

  • FY 2015:

    bought 20,000 RECs

  • FY 2016:

    Production started at the Wassaja and Solar Farm

  • FY 2017:

    PPA signed with RainSplitter Wind Farm in Nov 2016

  • FY 2018:

    Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power

  • FY 2021:

    includes first five months of Solar Farm 2.0

Theme: Energy 3.4 Purchase offsets for Supercomputers

Annual electrical consumption for Petascale Facility

Theme: Transportation 4.1 Reduce Air Travel Emissions
Theme: Transportation 4.2 Reduce Fleet emission in the next 5 years
Theme: Transportation 4.3 Develop scenarios for converting the fleet to renewable fuels
No metric specified for this objective
Theme: Transportation 4.4 Reduce Single Occupancy Vehicle Usage

4.4 Percent of Staff Driving Alone

Annotations

  • FY 2007:

    mi-plan survey

  • FY 2011:

    CUUATS survey

  • FY 2022:

    Mode Choice Survey 2022

Theme: Transportation 4.5 Implement the campus bicycle plan
Theme: Transportation 4.6 Appropriately staff sustainable transportation efforts
Theme: Land and Water 5.1 Obtain and Publicize Water Data

Percent Reduction in Potable Water Consumption

Annotations

  • FY 2020:

    includes covid-19 impacts

  • FY 2021:

    includes covid-19 impacts

Theme: Land and Water 5.2 Reduce cooling tower water use
No metric specified for this objective
Theme: Land and Water 5.3 Water Audit to establish conservation targets and facilities standard
Theme: Land and Water 5.4 Inventory & Benchmark existing landscape performance
No metric specified for this objective
Theme: Land and Water 5.5 Implement pilot projects for water reuse and / or non-potable water substitution
No metric specified for this objective
Theme: Land and Water 5.6 Stormwater runoff pollutant reduction
No metric specified for this objective
Theme: Zero Waste 6.1 Develop and apply environmental purchasing standards

6.1 Percent of Paper Purchased from OfficeMax with Recycled-Content

Theme: Zero Waste 6.2 Reduce MSW landfill volume

Municipal Solid Waste (MSW) Diversion Rate

Theme: Zero Waste 6.3 Methane Capture at Landfill
No metric specified for this objective
Theme: Zero Waste 6.4 Appropriately Staff Zero Waste Efforts
No metric specified for this objective
Theme: Land and Water 7.1 Assess and reduce agricultural emissions
No metric specified for this objective
Theme: Land and Water 7.2 Sustainable Plantings & Maintenance Across Campus
No metric specified for this objective
Theme: Land and Water 7.3 Sustainability in campus master plan
No metric specified for this objective
Theme: Zero Waste 7.4 Increase use of local food
Theme: Land and Water 7.5 Increase Carbon Sequestration

7.5 Total acres of agroforestry

Annotations

  • FY 2008:

    Includes the Illini Grove, the South Arboretum Woods, and the Forestry Tract

  • FY 2013:

    Added Woody Perennial Polyculture site at Sustainable Student Farm

  • FY 2015:

    Added Multifunctional Woody Polyculture at Energy Farm

  • FY 2018:

    Forestry Tract additional area

  • FY 2020:

    Solar Farm 2.0 buffer added

Theme: Land and Water 7.6 Agricultural runoff and subsurface drainage
No metric specified for this objective
Theme: Funding 8.1 Conduct an RFP Process for Offsets
Theme: Funding 8.2 Develop a Mechanism for Units to Purchase Offsets
No metric specified for this objective
Theme: Funding 8.3 Develop Local/Regional Mission-Linked Offsets
No metric specified for this objective
Theme: Funding 8.4 Use Offsets to Meet Unmet 2020 iCAP Targets
No metric specified for this objective
Theme: Funding 9.1 Studies of Feasibility, Costs, and Benefits
No metric specified for this objective
Theme: Funding 9.2 Increase Funding for Projects with Financial Payback

Funding available in any Revolving Loan Fund

Theme: Funding 9.3 Identify and Increase Available Funding for Projects without Payback

Funding available from Carbon Credit Sales at end of Fiscal Year

Theme: Reporting Progress 9.4 Evaluate the Feasibility of Internally Putting a Price on Carbon
No metric specified for this objective
Theme: Education 10.1 Undergraduate Sustainability Minor
No metric specified for this objective
Theme: Education 10.2 Undergraduate Research and Practical Experiences
No metric specified for this objective
Theme: Education 10.3 Add New Sustainability-focused Courses

Percent of Departments Offering Sustainability Courses

Theme: Engagement 11.1 Support Co-Curricular Student Sustainability Programs
No metric specified for this objective
Theme: Engagement 11.2 Strengthen Sustainability Outreach Programs
No metric specified for this objective
Theme: Engagement 11.3 Organize Three Major Sustainability Events Each Year
No metric specified for this objective
Theme: Research 12.1 iSEE Website
No metric specified for this objective
Theme: Research 12.2 Scholars Program
No metric specified for this objective
Theme: Research 12.3 Launch Thematic Research
No metric specified for this objective
Theme: Energy 2.1 Energy Planning Document
No metric specified for this objective
Theme: Energy 2.2 Increase Energy Efficiency

Energy Use Intensity

Annotations

  • FY 2008:

    iCAP baseline year

  • FY 2015:

    University's goal for 2015 met.

Theme: Energy 2.2.1 Improve Space Utilization
No metric specified for this objective
Theme: Energy 2.2.2 Reduce Building-level Energy
Theme: Energy 2.3 Clean Energy Sources
No metric specified for this objective
Theme: Energy 2.3.1 140,000 MWh/yr Clean Power

Total Purchased Clean Power

Annotations

  • FY 2008:

    Baseline

  • FY 2009:

    Production started at BIF

  • FY 2014:

    Production started at BRC

  • FY 2015:

    bought 20,000 RECs

  • FY 2016:

    Production started at the Wassaja and Solar Farm

  • FY 2017:

    PPA signed with RainSplitter Wind Farm in Nov 2016

  • FY 2018:

    Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power

  • FY 2021:

    includes first five months of Solar Farm 2.0

Theme: Energy 2.3.2 Clean Thermal Energy
No metric specified for this objective
Theme: Transportation 3.1 Fleet Replacement Plans
No metric specified for this objective
Theme: Transportation 3.2 Increase Pavement Condition Index
Theme: Transportation 3.3 Electric Vehicle Task Force
No metric specified for this objective
Theme: Transportation 3.4 Reduce Driving on Campus

4.4 Percent of Staff Driving Alone

Annotations

  • FY 2007:

    mi-plan survey

  • FY 2011:

    CUUATS survey

  • FY 2022:

    Mode Choice Survey 2022

Theme: Transportation 3.4.1 Develop a Commuter Program
No metric specified for this objective
Theme: Transportation 3.4.2 Implement Campus Bike Plan
Theme: Transportation 3.4.3 Telecommuting Policies
No metric specified for this objective
Theme: Transportation 3.5 Offset Air Travel Emissions
Theme: Land and Water 4.1 Reduce Water Consumption

4.1 Total Potable Water Use (kgal)

Annotations

  • FY 2020:

    includes covid-19 impact

  • FY 2021:

    includes covid-19 impact

Theme: Land and Water 4.2 Implement Resilient Landscape Strategy
No metric specified for this objective
Theme: Land and Water 4.2.1 Increase Number of Trees
Theme: Land and Water 4.2.2 Increase Pollinator-Friendly Areas

Pollinator-Friendly Areas

Theme: Land and Water 4.2.3 Double Green Infrastructure Installations
Theme: Land and Water 4.3 Cover Crops on South Farms
Theme: Land and Water 4.4 Monitor Soil Health
No metric specified for this objective
Theme: Zero Waste 5.1 Sustainable Procurement Reports
No metric specified for this objective
Theme: Zero Waste 5.2 Reduce Landfilled Waste
Theme: Zero Waste 5.2.1 Install Appropriate Infrastructure
Theme: Zero Waste 5.3 Establish a Culture of Reuse
Theme: Zero Waste 5.3.1 Zero Waste Messaging Campaign
Theme: Zero Waste 5.4 Reduce Food Scraps
No metric specified for this objective
Theme: Zero Waste 5.6 Use Local Food
Theme: Zero Waste 5.6.1 Food Literacy Project
No metric specified for this objective
Theme: Zero Waste 5.7 Green Cleaning Program
No metric specified for this objective
Theme: Education 6.1 Broaden Sustainability Education
No metric specified for this objective
Theme: Education 6.2 Sustainability Course Catalog
No metric specified for this objective
Theme: Education 6.3 Environmental Leadership Program
No metric specified for this objective
Theme: Education 6.4 Sustainability Internship Program
No metric specified for this objective
Theme: Education 6.5 Sustainability at Career Fairs
No metric specified for this objective
Theme: Education 6.6 Graduate Certificate in Sustainability
No metric specified for this objective
Theme: Engagement 7.1 Green Certifications
Theme: Engagement 7.2 Sustainable Events Program
No metric specified for this objective
Theme: Engagement 7.3 Green Sports Alliance
No metric specified for this objective
Theme: Engagement 7.4 Local Collaborations
No metric specified for this objective
Theme: Engagement 7.5 Support Youth Sustainability
No metric specified for this objective
Theme: Resilience 8.1 Urban Biodiversity Master Plan
No metric specified for this objective
Theme: Resilience 8.2 Coordinated Rainwater Management
No metric specified for this objective
Theme: Resilience 8.3 Environmental Justice Plan
No metric specified for this objective
Theme: Resilience 8.4 Local Sustainability Issues
No metric specified for this objective
Theme: Resilience 8.5 Inventory Green Jobs
No metric specified for this objective
Theme: Resilience 8.6 Vision Zero
No metric specified for this objective
Theme: Resilience 8.7 Local Offsets Program
No metric specified for this objective
Theme: Funding 9.1 Divest from Fossil Fuels
No metric specified for this objective
Theme: Funding 9.2 Sustainable Investing Policy
No metric specified for this objective
Theme: Reporting Progress 9.3 Include iCAP in Strategic Plan
No metric specified for this objective
Theme: Reporting Progress 9.4 Become STARS Platinum
No metric specified for this objective
Theme: Energy 1. Real Time Energy Displays
Theme: Energy 2. Energy Liaisons - Presentation in Individual Buildings
No metric specified for this objective
Theme: Energy 3. Eco-Reps Pilot Program
No metric specified for this objective
Theme: Energy 4. AFMFA Funding Use for Sustainability Needs
No metric specified for this objective
Theme: Energy 5. Weatherization of Existing Campus Buildings
No metric specified for this objective
Theme: Energy 6. Fume Hoods Reduction
No metric specified for this objective
Theme: Energy 7. Fume Hoods Conversion from CAV to VAV
No metric specified for this objective
Theme: Energy 8. Fume Hoods Education
No metric specified for this objective
Theme: Energy 9. Update Standards for New Construction, Major Renovations, and Replacement Units
No metric specified for this objective
Theme: Energy 10. Insulation of Hot Water Tanks
No metric specified for this objective
Theme: Energy 11. Recovered Heat
No metric specified for this objective
Theme: Energy 12. Temperature Setbacks- Energy Use Policy Enforcement
No metric specified for this objective
Theme: Energy 13. Campus Computer Policy Update and Enforcement
No metric specified for this objective
Theme: Energy 14. Purchasing Standards for Energy Conservation

6.1 Percent of Paper Purchased from OfficeMax with Recycled-Content

Theme: Energy 15. Lighting Retrofit Project Completion
No metric specified for this objective
Theme: Energy 16. Lighting Sensors Project
No metric specified for this objective
Theme: Energy 17. Steam System Maintinence
No metric specified for this objective
Theme: Energy 18. Retrocomissioning Strategic Plan
No metric specified for this objective
Theme: Energy 19. Direct Digital Control Command Center
No metric specified for this objective
Theme: Land and Water 20. Green Roof Feasibility Study
No metric specified for this objective
Theme: Energy 21. Carbon Offsets for Massive Energy Users
No metric specified for this objective
Theme: Energy 22. Energy Chargeback System
Theme: Energy 23. Update Maintenance Procedures
No metric specified for this objective
Theme: Energy 24. Funding the Maintenance Division for Sustainability Improvements
No metric specified for this objective
Theme: Zero Waste 25. Food and Waste Study
No metric specified for this objective
Theme: Reporting Progress 26. Integrate ICAP into Campus Strategic Plan
No metric specified for this objective
Theme: Research 27. Integrate ICAP into Research Park
No metric specified for this objective
Theme: Reporting Progress 28. Resource Plan for ICAP
No metric specified for this objective
Theme: Reporting Progress 29. Progress Reports for ICAP
No metric specified for this objective
Theme: Education 30. Research Seminar
No metric specified for this objective
Theme: Education 31. Integrate Sustainability into Curriculum
No metric specified for this objective
Theme: Education 32. Educational Programs
No metric specified for this objective
Theme: Engagement 33. Sustainability Public Engagement
No metric specified for this objective
Theme: Engagement 34. Student Projects Off Campus
No metric specified for this objective
Theme: Funding 35. Allocate Savings from Sustainability Projects
No metric specified for this objective
Theme: Funding 36. Clean Energy Fund
No metric specified for this objective
Theme: Funding 37. Grants for Reducing GHG Emissions/Sustainability Projects
No metric specified for this objective
Theme: Research 38. 2012 Campus Energy Study
No metric specified for this objective
Theme: Funding 39. Abbot Power Plant 5-Year Plan

Total Coal Use at Abbott Power Plant (MMBTU)

Theme: Energy 40. Burning Biomass at Abbott Power Plant
No metric specified for this objective
Theme: Energy 41. Wind Turbine
No metric specified for this objective
Theme: Energy 42. Solar Power on Campus Parking Decks
No metric specified for this objective
Theme: Energy 43. Campus Power Contracts for Renewables
Theme: Energy 44. Methane Capture Pilot Project at Beef and Sheep
No metric specified for this objective
Theme: Energy 45. Miscanthus Boiler
No metric specified for this objective
Theme: Energy 46. Process for Purchasing Local Carbon Offsets
No metric specified for this objective
Theme: Energy 47. 5% Renewable Sources

Percent of Power from Renewable Sources

Theme: Energy 48. Reduce F&S Idling
No metric specified for this objective
Theme: Energy 49. Alternative Service Vehicles
No metric specified for this objective
Theme: Energy 50. Preferential Treatment for high MPG Vehicles
No metric specified for this objective
Theme: Transportation 51. Sustainable Transportation Infrastructure
No metric specified for this objective
Theme: Transportation 52. Campus Bike Plan
Theme: Transportation 53. Voluntary Carbon Offsets for Air Travel
No metric specified for this objective
Theme: Land and Water 54. Space Marketplace
No metric specified for this objective
Theme: Energy 55. Net Energy Neutral Buildings by 2025
No metric specified for this objective
Theme: Energy 56. LEED Certification Requirements

Square Footage certified as LEED each year

Theme: Energy 57. LEED Gold Design Review

Square Footage LEED Gold Certification

Annotations

  • Nov 4, 09:

    National Petascale Computing Facility

  • Nov 4, 11:

    UIUC NCSA Petascale Computing Facility

  • Feb 1, 17:

    Wassaja Hall

  • Jun 29, 18:

    State Farm Center 

  • Aug 7, 18:

    Ikenberry Commons Res.Hall-Phase C & D

  • Oct 19, 18:

    Surveying Building Renovation

  • Oct 30, 18:

    Chemistry Annex

  • Jan 29, 19:

    Chez Family Foundation Center for Wounded Veterans in Higher Education

  • Aug 29, 19:

    Everitt Laboratory Renovation U14088

Theme: Land and Water 58. Reduce Campus Square Footage
No metric specified for this objective
Theme: Land and Water 59. Tile-Drainage Wetlands
No metric specified for this objective
Theme: Land and Water 60. Sustainable Agricultural Practices
No metric specified for this objective
Theme: Land and Water 61. No Net Increase in Campus Space
No metric specified for this objective
Theme: Land and Water 62. Short Term Sustainable Landscape Projects
No metric specified for this objective
Theme: Land and Water 63. Sustainable Landscapes Plan
No metric specified for this objective
Theme: Zero Waste 64. Large-Scale Food Composting
Theme: Zero Waste 65. Local Foods
Theme: Zero Waste 66. Local Foods Network
No metric specified for this objective
Theme: Funding 67. Incorporate Carbon Costs into Food Products Sold on Campus
No metric specified for this objective
Theme: Zero Waste 68. Increase Recycling Rate

Municipal Solid Waste (MSW) Diversion Rate

Theme: Zero Waste 69. Eliminate Purchase of Non-Recyclable Material when Suitable Substitutes Exist
No metric specified for this objective
Theme: Zero Waste 70. Use Life-Cycle Cost Analysis for Major Purchases
No metric specified for this objective
Theme: Zero Waste 71. Purchasing Policies to Support the Enviornment

6.1 Percent of Paper Purchased from OfficeMax with Recycled-Content

Theme: Zero Waste 72. Cataloging System for Reuse of Surplus Durable Goods
No metric specified for this objective
Theme: Zero Waste 73. Legislative Change to Allow for Resale of Durable Goods to Local Public
No metric specified for this objective
Theme: Zero Waste 74. Zero-Waste Campus Policy
No metric specified for this objective
Theme: Land and Water 75. True Cost of Water Study
No metric specified for this objective
Theme: Land and Water 76. Water Chargeback System
No metric specified for this objective
Theme: Land and Water 77. Use of Non-Potable Water
No metric specified for this objective
Theme: Land and Water 78. Raw Water System
No metric specified for this objective