You are here

Rooftop Solar work to start this summer

Posted by Morgan White on May 25, 2018

The 235,000 GSF facility for the Electrical and Computer Engineering department will integrate instruction and research. This project is to reinforce structural steel members in the building for the future placement of a rooftop solar array. There are 970 modules to install with a total DC power rating of 272 kW.