You are here

Projects Updates for Explore Options for 100 Percent Clean Campus Energy

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Campus Energy Student Video 2022

    In December of 2022 Aaryaman Patel, a Mechanical Engineering student, published a video for a competition through the International District Energy Association. The purpose of the video is to highlight energy systems within a University campus.

    Below is the link to his video:

    https://www.youtube.com/watch?v=PLrt4X0EOGA

     

  2. Energy iCAP Team Meeting 10/7/2022

    The energy iCAP team met on Friday, October 7th 2022 to review the team's presentation for the campus sustainability celebration, review the team's priorities for the year, and discuss options for advancing the proposed clean energy plan and increasing procurement of renewable energy through power purchasing agreements.

    Link to meeting recording: https://mediaspace.illinois.edu/media/t/1_5bh3gs4r

  3. Energy Source Options Final Design Report 5/6/22

    The attached document is entitled Energy Source Options Final Design Report. Which is a report done for ME 470 Senior Design. 

    The report details research on the use of compressed CO2 as a refrigerant. The goal of the report was to determine if this system would be viable option for providing green energy on campus.

    Attached Files: 
  4. Energy iCAP Team January Meeting

    The Energy iCAP team met at 9:00 A.M. on Wednesday, January 26th and discussed updates on recommendation ideas as well as agreed to move forward with the submission of two recommendations to the iCAP Working Group. Progress is currently being made on a feasibility study of CO2 District Heating and Cooling which will be undertaken by a group of engineering students during the Spring Semester, and progress on a new recommendation for Building Envelope Commissioning will take place.

    The Team also agreed to move forward with a recommendation that the Office of the Chancellor commission a report on the Safety and Security of a proposed MMR Nuclear Reactor on campus property as well as another recommendation that would seek to charge Facilities & Services with developing a comprehensive energy plan that will bring the University to net-zero emissions by 2050.

    Further Details on the meeting can be found in the attached agenda which also contains meeting minutes.

    Attached Files: 
  5. Sustainability Council meeting 04-30-2019

  6. ENVS 301 students' presentations

  7. EGEN SWATeam Meeting (2.3.17)

    The EGEN SWATeam a meeting for the Spring 2017 semester. Topics covered include:

    • Determining Team Chair
    • Final Review of rooftop solar recommendation and Petascale offsets recommendation.
    • What constitutes clean energy usage? (REC count vs. RECs don't count)
    Attached Files: 
  8. EGEN SWATeam Meeting (1.20.17)

    The EGEN SWATeam held their first meeting for the Spring 2017 semester. Topics covered include:

    • Review draft recommendations for 1) on-campus solar and 2) petascale offsets
    • An update from Morgan Johnston on the Associate Director of Campus Sustainability position
    • Updating iCAP portal project pages for EGEN objectives
    • Clean Energy PPA
    • Potential for future solar farm
    • Asking for feedback from EGEN team members regarding recommendation proces
  9. EGen004 Electrification Study recommendation - Returned

    The iCAP Working Group (iWG) met on December 6, 2016, to discuss the SWATeam recommendation, eGen004 Electrification Study. The iWG agreed to return the recommendation to the eGen SWATeam for further discussion with F&S, iSEE, and other stakeholders.

    See SWATeam recommendation eGen004 Electrification Study here.

  10. EGEN SWATeam Meeting (12.2.16)

    The EGEN SWATeam held their final meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Niharika Kishore regarding rooftop solar on campus
    • Potential recommendations to Working Group
    • Potential solar: greenspace vs. rooftop vs. parking lot cover
  11. Biomass Boiler at Energy Farm

    Construction is underway in Fall 2016 to install a 200 kW biomass boiler at the Energy Farm. This system will initially satisfy all heating needs for the greenhouse onsite, and will replace the current propane heating system. In the future, more buildings may be added to the boiler system.

  12. Geothermal Profile Project

    Beginning Fall 2016, a team at the Illinois State Geological Survey (ISGS, a division of the prairie Research Institute) led by Illinois Professor Yu-Feng Forrest Lin is conducting a series of detailed observations of the geothermal profile on campus - including high-resolution temperature profiling and thermal analysis. The team will drill to 330 ft and install a geothermal loop and fiberoptic cables. Results will help determine the feasibility of implementing geothermal systems on campus by identifying costs and possible challenges.

    Professor Lin has coordinated with faculty from the University of Wisconsin to incorporate lessons learned from their implementation of a geothermal exchange system at the nearby EPIC health care systems campus in Verona, WI.

    Professor Lin's team began drilling on 9/19/16. Daily drilling progress is logged and can be found by clicking this link.

    Attached Files: 
  13. Electrification Study discussion with F&S

    Ben McCall, Morgan Johnston, Scott Willenbrock, and Mike Larson met with Ted Christy and Jim Sims to discuss the process for an Electrification Study.  Ted provided the attached document that needs to be completed in order to move forward.  Additionally, Ted indicated that attachment a is the most pertinent.  He said, "This statement would tell us what, from your perspective you hope to receive at the end of this study for it to be considered successful. It doesn’t need to get into detail. A paragraph or two in your own words to provide general description is very helpful. On the other hand, don’t feel like you need to limit this item, many departments submit a several page document. This information is used by the Planner to develop a scope statement that you will need to sign off on before we seek project approval."

    Attached Files: 
  14. EGen004 Electrification Study recommendation - Submittal

    The eGen SWATeam submitted a recommendation to the iWG stating, "Hire a consultant to undertake a study of electrifying most space and water heating on campus."

    See attached the SWATeam recommendation EGen004 Electrification Study complete with comments from all the eGen SWATeam members.

  15. Award Letter - Anaerobic Digester Pilot

    Food waste is the second largest category of municipal solid waste (MSW) sent to landfills in the United States, accounting for approximately 18% of the waste stream. Agricultural and garden wastes comprising of wood and yard trimmings come next in the list, accounting for approximately 15% of the waste stream. At the U of I campus as well, about 100-120 gallons of food waste is generated from one dining hall unit per week. That is roughly 0.5 cubic yards/week currently.
    Anaerobic digestion occurs naturally, in the absence of oxygen, as bacteria break down organic materials and produce biogas. The process reduces the amount of material and produces biogas, which can be used as an energy source. This technology is commonly used throughout the United States to break down sewage sludge at wastewater treatment facilities. In the past few years, there has been a movement to start adding food waste to anaerobic digesters already in place at wastewater treatment facilities.
    This proposal provides setup costs for a pilot test of an anaerobic digestion process to determine if a full-scale digester prototype is feasible.

  16. Note on iCAP 2015 objective 3.1

    Objective 3.1 is for the SWATeam to lead an exploration of options for 100% clean energy and submit recommendations. F&S staff workload is too high to handle the exploration of options, so F&S will provide data and provide comments. Ben McCall and Scott Willenbrock will develop a plan for how to achieve carbon neutrality. They will make a document with potential options, pros, cons, and costs.