You are here

Projects Updates for Geothermal Test Well at Energy Farm

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Funding Letter - Geothermal TRT

    The applied for funding will be used in the construction of a Thermal Response Test unit for use in the Geothermal Pilot project that is currently being implemented on the UIUC Campus. The overall goal of the project is to assess the viability of geothermal heat exchange on this campus as well as the best implementation of this technology. The Thermal response test unit will measure the ability of the local geology to support geothermal heat exchange in the future. The unit will be designed to be used in all future geothermal projects. This project is student-led, and development and construction of the Thermal Response Test Unit will be conducted entirely by University of Illinois students. This proposal directly funds: 1) Construction Supplies 2) Transportation Costs.

  2. Geothermal Profile Project

    Beginning Fall 2016, a team at the Illinois State Geological Survey (ISGS, a division of the prairie Research Institute) led by Illinois Professor Yu-Feng Forrest Lin is conducting a series of detailed observations of the geothermal profile on campus - including high-resolution temperature profiling and thermal analysis. The team will drill to 330 ft and install a geothermal loop and fiberoptic cables. Results will help determine the feasibility of implementing geothermal systems on campus by identifying costs and possible challenges.

    Professor Lin has coordinated with faculty from the University of Wisconsin to incorporate lessons learned from their implementation of a geothermal exchange system at the nearby EPIC health care systems campus in Verona, WI.

    Professor Lin's team began drilling on 9/19/16. Daily drilling progress is logged and can be found by clicking this link.

    Attached Files: