  1. Final Update

    Associated Project(s): 

    Good Evening All,

    There was a short hiatus of meetings as the semester was coming to an end due to conflict of schedules but we were able to meet today. Even though we did not meet I was still finishing and touching up the items we planned last meeting. I was able to finalize the water audit program and it is attached. I then came up with some water sustainability goals the University of Illinois should pursue. Lastly I was able to water a page on why water scarcity is an important issue that we as a university should took more interest in even though it may seem we have no issues here. The Mahomet aquifer is the body of water most of central Illinois uses and each area has a limit of usage before it starts depleting. Once it starts to deplete there some irreversible consequences. The aquifer’s head has already lowered by 50 feet since 1950 and with the growing demand from the university this issue should not be looked past. This combined with the data collection and analysis excel files will mark the end of my time working on this project.

    It has been a pleasure working on this water inventory ICAP goal and helping out other areas of the campus more to more water sustainable practices. The past semester has been a great learning experience for me and cannot wait to see how the school continues to progress towards a more sustainable future. Thank you for keeping up with my progress! Austin Jung signing off.

    Best Regards,

    Austin Jung

  2. Week 10 Update

    Associated Project(s): 

    Good Afternoon All,

    This week’s meeting was productive and we were able to set up the excel spreadsheets needed to record data on the chiller plants, Abbott, and potable water. Over the past week I researched and created a checklist and table for conducting a water audit. The checklist will be shared here after some final corrections are made to it. I was able to determine what was needed and where stamped flow volumes are marked on each fixture. If there is no stamp on faucets there is a simple tool called a flow rate bag that will be purchased so auditors can determine the flow manually. As for urinals and lavatories the model and serial number will be recorded to search the model manually and figure out the flow rate. There is no hand tool to determine these flow rates.

    The spreadsheets will be given to Mike Marquissee so his team can collect the data we need faster. Once the data is collected some analysis of it will be done to help us determine efficiencies and water consumption of the different facilities. Also it will help us figure out if we have line losses in our systems.

    The next steps to be done this week is to get these excel spreadsheets to Mike and give him some time to gather all of the data we need. Analyze the raw data and compare the values to industry and national standards. This will allow us to figure out where we stand in our water consumption. Finish editing the water audit checklist and add snap shots of where the stamps can be located so it will be easier for auditors to know where to look. The water audit program we are creating right now will mainly be used for bathrooms and kitchens in university buildings. Research laboratories and student laboratories will be done by another team and program in the works.

    Thank You,