  1. Water006 Lot F23 Monitoring - Transmitted

    Following the completion of iWG assessment for Water006 Lot F23 Monitoring, the recommendation was transmitted back to the Water SWATeam so that a proposal for funding this project may be submitted to the Student Sustainability Committee.

    See iWG assessment of Water006 Lot F23 Monitoring attached.

    See SWATeam Recommendation Water006 Lot F23 Monitoring here.

    Attached Files: 
  2. Water006 Lot F23 Monitoring - Submittal

    The WSW SWATeam submitted a recommendation to the iWG, stating: 

    "The Water/Stormwater SWATTeam recommends that instrumentation to monitor the quality and quantity of runoff from parking lot F23 should be installed in the storm sewer carrying runoff from the lot. An instrumentation vault was installed at the southeast corner of the lot (where the storm sewer leaves the lot) several years ago, but no instrumentation installed. In order to demonstrate the impact of Green Stormwater Infrastructure (GSI), this instrumentation should be installed and operational for at least one year before GSI is installed on the lot to provide a baseline to compare the post -installation runoff quality and quantity. We suggest a pressure transducer to record continuous water level (providing the flow rate using a calibrated stage-flow rating), a water-quality multiprobe with sensors for: turbidity, nitrate, pH, dissolved oxygen, temperature, specific conductivity, fluorescent dye (which will be used to develop the stage-flow rating). The location would also need a data logger to record the measurements, and auxiliary components such as power supply and shelter."

    See attached the SWATeam recommendation Water006 Lot F23 Monitoring complete with comments from WSW SWATeam members.

    An iCAP Working Group assessment of this recommendation began on June 7, 2019.

  3. Water005 Rainworks Design Lot F4 recommendation - Assessment started

    The iCAP Working Group (iWG) met on May 10, 2018, to discuss and start the discussion on SWATeam recommendation, Water005 Rainworks Design Lot F4. The iWG's draft comment on the recommendation was:

    "Do a feasibility study for lot F4, incorporating the green infrastructure from the conceptualization completed by the students in the award winning rainworks challenge. Potential funding could be requested from the Student Sustainability Committee (SSC)."

    See SWATeam recommendation Water005 Rainworks Design Lot F4 here.

  4. Water004 GSI Standards Parking Lots recommendation - Assessment started

    The iCAP Working Group (iWG) met on May 10, 2018, to discuss and start the assessment of Water004 GSI Standards Parking Lots recommendation. The iWG's draft assessment was:

    "F&S should include the minimum requirements of Green Stormwater Infrastructure (GSI) in the Facilities Standards, as described in the Campus Master Plan."

    See SWATeam recommendtion Water004 GSI Standards Parking Lots here.

  5. Water004 GSI Standards Parking Lots recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG, stating, "The Facilities and Services Standards for Parking and for Stormwater Systems should be revised to include a greater emphasis on sustainable design Green Stormwater Infrastructure (GSI) for stormwater management. This revision will align these standards with the newly adopted 2017 Campus Master Plan."

    See attached the SWATeam recommendation, Water004 GSI Standards Parking Lots, complete with comments from all the Water and Stormwater SWATeam members.

  6. Water005 Rainworks Design Lot F4 recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation, to the iWG, stating, "The appropriate campus units (Parking, Facilities and Services) should begin the process of implementing the award winning green stormwater redesign for parking Lot F4."

    See attached the SWATeam recommendation, Water005 Rainworks Design Lot F4, complete with comments from all the Water and Stormwater SWATeam members.

    Also, attached are the two supporting documents as submitted by the SWATeam.