  1. Water001 BIF Greywater Meter recommendation - Assessment with comments

    The iCAP Working Group (iWG) met on December 20, 2016, to discuss and start the assessment of SWATeam recommendation, Water001 BIF Greywater Meter. The iWG's official comment on the recommendation was:

    "A permanent real-time water meter should be installed on the greywater piping system in BIF, and the collected data should be made available in the Energy Billing System and through an online dashboard."

    See attached the iWG assessment of Water001 BIF Greywater Meter complete with official comments from all the iWG members.

    See SWATeam recommendation Water001 BIF Greywater Meter here.

  2. Water003 Design Center Greywater Piping recommendation - Denied

    The iCAP Working Group (iWG) met on December 20, 2016, to discuss the SWATeam recommendation, Water003 Design Center Greywater Piping. After some discussion, the iWG rejected this recommendation.

    See SWATeam recommendation Water003 Design Center Greywater Piping here.