You are here

Projects Updates for Topic: Lot F23

  1. Water006 Lot F23 Monitoring - Transmitted

    Following the completion of iWG assessment for Water006 Lot F23 Monitoring, the recommendation was transmitted back to the Water SWATeam so that a proposal for funding this project may be submitted to the Student Sustainability Committee.

    See iWG assessment of Water006 Lot F23 Monitoring attached.

    See SWATeam Recommendation Water006 Lot F23 Monitoring here.

    Attached Files: 
  2. Water006 Lot F23 Monitoring - Submittal

    The WSW SWATeam submitted a recommendation to the iWG, stating: 

    "The Water/Stormwater SWATTeam recommends that instrumentation to monitor the quality and quantity of runoff from parking lot F23 should be installed in the storm sewer carrying runoff from the lot. An instrumentation vault was installed at the southeast corner of the lot (where the storm sewer leaves the lot) several years ago, but no instrumentation installed. In order to demonstrate the impact of Green Stormwater Infrastructure (GSI), this instrumentation should be installed and operational for at least one year before GSI is installed on the lot to provide a baseline to compare the post -installation runoff quality and quantity. We suggest a pressure transducer to record continuous water level (providing the flow rate using a calibrated stage-flow rating), a water-quality multiprobe with sensors for: turbidity, nitrate, pH, dissolved oxygen, temperature, specific conductivity, fluorescent dye (which will be used to develop the stage-flow rating). The location would also need a data logger to record the measurements, and auxiliary components such as power supply and shelter."

    See attached the SWATeam recommendation Water006 Lot F23 Monitoring complete with comments from WSW SWATeam members.

    An iCAP Working Group assessment of this recommendation began on June 7, 2019.

  3. Meeting 27 September

    Topics of discussion included the planned water audit and parking lots that could be used for studies related to stormwater runoff. A student in the Sustainability minor planned to work with Rabin Bhattarai on the audit. The EPA Rainworks Project would have potential to redesign Parking Lot F4 because Burnsides Laboratory will be torn down.