You are here

Projects Updates for Topic: recommendation

Pages

  1. Water005 Rainworks Design Lot F4 recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation, to the iWG, stating, "The appropriate campus units (Parking, Facilities and Services) should begin the process of implementing the award winning green stormwater redesign for parking Lot F4."

    See attached the SWATeam recommendation, Water005 Rainworks Design Lot F4, complete with comments from all the Water and Stormwater SWATeam members.

    Also, attached are the two supporting documents as submitted by the SWATeam.

  2. ECONS006 Energy Conservation Funding 2017 recommendation - Transmittal

    The iCAP Working Group (iWG) Chair, Dr. Ximing Cai, forwarded the ECONS006 Energy Conservation Funding 2017 recommendation to the Provost following the completion of iWG assessment of the same. 

    ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Dear Provost Andreas Cangellaris:

    On behalf of Illinois Campus Sustainability Working Group (iWG), I’m sending you a recommendation on energy conservation funding, which was made by Sustainability Working Advisory Group on Energy Conservation and Building Standards (SWAT-ecbs). The recommendation was then evaluated by iWG

    Energy conservation is vital to maintaining our energy savings and emission reductions and has a strong payback. iWG suggests that the Provost’s Office considers this recommendation when reviewing Facilities and Services’ budget for FY19. Attached please see the original recommendation made by SWAT-ecbs and the evaluation of by iWG.

    If you have any questions about the recommendation, please let us know. We would appreciate any responses regarding your perspective on this recommendation.

    Thank you for your consideration and support to campus sustainability.


    Best regards

    Ximing Cai

    ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    For any future updates on this item, please visit the Utility and Energy Services Funds project.

    See iWG Assessment of the ECONS006 Energy Conservation Funding 2017 here.

    See SWATeam recommendation ECONS006 Energy Conservation Funding 2017 here.

     

  3. ECONS006 Energy Conservation Funding 2017 recommendation - Assessment with all comments

    The iCAP Working Group (iWG) met on November 30th, 2017, to discuss the ECONS006 Energy Conservation Funding 2017, and started the assessment of this recommendation. Their official comment was:

    "Energy Conservation is vital to maintaining our energy savings and emission reductions and has a strong payback. The Provost’s Office should consider this recommendation when reviewing Facilities and Services’ budget for FY19 and should consider this in light of the larger budget reform process."

    See the attached file for the complete assessment of this recommendation complete with official comments from all the iWG members.

    See SWATeam recommendation ECONS006 Energy Conservation Funding 2017 here.

  4. South Farm Management Plan recommendation - Assessment Started

    The iCAP Working Group (iWG) met on March 14th, 2018 to discuss the ALUFS004 South Farm Management Plan recommendation. We were joined by Bruce Branham and Colleen Williams from the ALUFS SWATeam to explain the objectives behind the recommendation.

    The iWG started the assessment on March 14th, 2018, and their draft assessment of the recommendation was:

    The iWG recommends that the Dean of ACES charges a committee to develop a management plan (as described by the SWATeam) to promote sustainable practices on South Farm. Committee should include Farm Managers, faculty experts including ACES, PRI and water scholars, and students. The plan should include the assessment of the current status, evaluation of operational and financial impacts, and impediments to Best Management Practices.

    See SWATeam recommendation ALUFS004 South Farm Management Plan here.

  5. PWR011 SmartWay Union recommendation - Submittal

    The PWR SWATeam submitted a recommendation to the iWG stating, "We recommend that Facilities and Services and the Illini Union become certified as an EPA SmartWay Logistics Company Partner, following the example set by University Housing and Dining Services in 2013."

    See attached the SWATeam recommendation PWR011 SmartWay Union complete with comments from all the PWR SWATeam members.

  6. ALUFS004 South Farm Management Plan Recommendation - Submittal

    The ALUFS SWATeam submitted a recommendation to the iWG stating, "A committee of ACES faculty, farm personnel, and iSEE members will develop a comprehensive and cooperative management plan for all non-research agricultural land on the UIUC South farms that promotes sustainable practices and implements current best management practices. The plan should account for crop rotations, soil management, nutrient application, and pest management. This strategy must consider the needs and wishes of the departments that rely on the productivity of this land for financial return. The plan should offer detailed recommendations, costs of implementation, and estimated reductions in greenhouse gas emissions from adopted practices. The committee should include faculty with expertise in biogeochemistry as well as staff responsible for agricultural production."

    See attached the SWATeam recommendation ALUFS004 South Farm Management Plan complete with comments from all the ALUFS SWATeam members.

  7. EGen007 Solar Farm 2.0 recommendation - Assessment with all comments

    The iCAP Working Group (iWG) met on October 27th, 2017, to discuss and start the assessment of the SWATeam recommendation EGen007 Solar Farm 2.0. The iWG's final recommendation was:

    "The iWG agrees that this is the most cost-effective method for meeting the iCAP objective of 25,000 MWh/year of on-campus solar generation by FY25.  To meet that goal, the Solar Farm 2.0 project needs to begin soon, under F&S direction."

    See attached the iWG assessment complete with official comments from all the iWG members.

    See SWATeam recommendation EGen007 Solar Farm 2.0 here.

  8. EGen007 Solar Farm 2.0 recommendation - Transmittal

    The SWATeam recommendation, eGen007 Solar Farm 2.0, was transmitted to the Sustainability Council and was presented during their meeting on December 7, 2017.

    For future updates, please refer to Solar Farm 2.0.

    See iWG assessment of EGen007 Solar Farm 2.0 here.

    See SWATeam recommendation EGen007 Solar Farm 2.0 here.

  9. ECONS006 Energy Conservation Funding 2017 recommendation - Submittal

    The ECBS SWATeam submitted a recommendation to the iWG stating, "We recommend the following actions and funds to implement critical projects key to energy conservation efforts at UIUC. Total funds needed: $3.55M

    1) RESTORE funding of ~ $1.5M in FY19, compensating for loss of DCEO grants (Department of Commerce and Economic Opportunity), to continue the Retro-commissioning (RCx) work. Retro-commissioning = Identifying and implementing operational and maintenance improvements to existing buildings (first pass) to ensure continued optimal performance over time.

    2) INCREASE the Recommissioning (REx) and Preventive Maintenance (PM) teams. Re-commissioning = Building operating and maintenance systems are examined, parts may be fixed or replaced, and systems reset as if they were being installed new. REx is usually performed about 5 years after RCx has passed thru a building and reoccurs about every 5 years going forward. Preventive Maintenance = actions to preserve life of equipment and prevent breakdowns (cleaning of coils, review of air handling unit systems, review of hydronic systems.) Occurs before re-commissioning. The PM group reports to the maintenance side of the organization whereas the RCx and REx teams report to Utilities and Energy Services. In terms of priority:

    • Change the 5th recommissioning team that is temporary for FY18 to make it permanent in FY19 ($350K/year)
    • Increase Building Maintenance and Preventive Maintenance teams from 1 to 2 for FY19. ($350K for 2nd team)
    • Implement systematic building control upgrades to enhance further energy conservation and/or replace outdated equipment (IT audit item) ($1M/year).
    • Increase Recommissioning teams from 5 to 6 for FY2019 ($350K for 6th team)."

    See attached the SWATeam recommendation ECONS006 Conservation Budget Funding 2017 complete with comments from all the ECBS SWATeam members.

  10. ECONS004 Green Labs Coordinator Recommendation - Transmittal

    Following the completion of iWG assessment for ECONS004 Green Labs Coordinator, the recommendation was transmitted to Melanie Loots and Jan Novakofski from the VCR's office.

    See iWG assessment of ECONS004 Green Labs Coordinator here.

    See SWATeam recommendation ECONS004 Green Labs Coordinator.

Pages