  1. 18F Semesterly Report - Beginning bike maintenance classes

     

    Simon taught 15 sessions with around 100 attendants total, over the 15 weeks. The sessions were Mondays from at 6:30. The sessions began on 9/5/2017 and concluded at the end of the fall semester.

     

    The manager of the Campus Bike Center, Jake Benjamin, will help us seek another qualified student to teach the class this spring.

     

  2. 18F Semesterly Report - Baler Conceptualization

     

    On March 1, 2018, Morgan White, Pete Varney, and Shawn Patterson met with capital planner Trent Beane, a representative of the engineering firm, and a manufacturer’s rep from Dehart Recycling.  We discussed the project needs, and the current status of the WTS equipment.  Some notable points are listed below:

    • The existing baler was installed in 1996
    • Design of balers has changes a lot, with lower labor costs and alternatives to the perforator currently used at WTS.
    • The power supply is probably similar to the existing power demand.

    After the meeting, the engineering firm was asked to provide a formal proposal to F&S to approve and begin the design work.  Unfortunately, this process was delayed due to emergency family medical issues for Mr. Beane. 

     

    In August 2018, a new planner was assigned, Chris Anzelmo. Anzelmo finalized the agreement with the engineering firm and arranged a kick-off meeting.  In November 2018, the engineer visited the Illinois Sustainable Technology Center (ISTC) to examine the Styrofoam densifier and gathered additional information from the WTS.

     

    Then on December 13, 2018, preliminary drawings were shared with F&S. At that meeting, discussions included the needs for modifying the “pit” at the base of the baler entry system, adjusting the pathway width between the baler and the north wall, and recognition that locating the Styrofoam densifier at the WTS would require a building addition. Information about the HVAC system and required code updates were also reviewed.

     

    On January 2, 2019, a baler vendor representative met with us at the WTS. They are going to look at an alternative baler that could provide the needed walkway space on the north end and use the existing pit.

     

     

  3. 18F Semesterly Report - LED Classroom Updates

    Most of the incandescent lamps in the General Assignment classrooms have been replaced with LED lamps at this point.  Several classrooms have also had new dimmers installed to properly control the lights.  Four more buildings have been started and need to be completed.

  4. 18F Semesterly Report - TBH

    We have begun data collection to compare baseline energy consumption to energy consumption after installation of the pilot project - energy efficient HVAC control retrofit. Sensors needed were determined and installed. Data collection has begun with 4 weeks of data so far. Initial review of the data has identified several challenges with the HVAC already including heating valves that are leaking by providing heat where not required, which explains why the Air Handler is getting rid of heat even in the winter. The variable air volume system is also not varying as it should. This is demonstrating some pitfalls of pneumatically controlled HVAC systems.

  5. 18F Semesterly Report - Supermileage

    Last year in competition our new car earner us 12th place with 614mpg. This is much lower than we had hoped for but we have identified our problems and are ready for a much better season. Our biggest issue was we encountered a fuel leak. The leak was not discovered until the last day of competition when it could not be fixed in time. This had a large impact on our fuel economy and kept us from being successful. We also had a bad gear ratio which meant we had to run our engine more than we would have liked to. Finally, we had a lot of issues with our body panels that increased our drag. We have resolved the fuel leak and gear ration, and are redoing some of our body panels to correct this. We hope to bounce pack and break 1000mpg this year.