Projects Updates for Topic: solar

Pages

  1. Feasibility Study Report

    Associated Project(s): 

    This Feasibility study considers the potential placement of a Photovoltaic array on the roof of Krannert Center for the Performing Arts (KCPA). The Study was conducted in two phases, the reports of which are included herein. A construction budget of five hundred eighty-five thousand dollars ($585,000), excluding contingencies, was proposed by the Student Sustainability Committee.

  2. Summary of study results

    Associated Project(s): 

    This Feasibility study considers the potential placement of a Photovoltaic array on the roof of Krannert Center for the Performing Arts (KCPA). The Study was conducted in two phases, the reports of which are included herein. A construction budget of five hundred eighty-five thousand dollars ($585,000), excluding contingencies, was proposed by the Student Sustainability Committee.

    Based on shadow studies, it was determined that placement of a photovoltaic array on the roof of the Great Hall would maximize the potential power gain, as compared to other locations at KCPA. However, structural analyses have shown that the roof structure would require strengthening prior to the application of any new load. Additionally, based on its age, it is recommended that the roofing be replaced prior to the installation of a photovoltaic array. Access to the roof is cumbersome, and is also in need of improvement. The opinion of probable construction cost for this associated work exceeds the five hundred eighty-five thousand dollar ($585,000) construction budget. Without considering these associated projects in the payback analysis, the complexities of constructing a PV array on the roof structure diminish the economical effectiveness of a roof mounted PV array as compared to a ground-mounted system, assuming the ready
    availability of real estate.

    Based on these findings, it is the recommendation of Hanson Professional Services Inc. (Hanson) that a photovoltaic array not be placed on the roof of the Great Hall at KCPA, and that consideration be given instead to directing the available funds to a location that is more readily suited to its construction.

  3. F&S comment on solar house at Energy Farm

    Associated Project(s): 

    Collin has been involved in this project from the very beginning, so he should be involved in any further discussions on this project. I really want to ensure proper code compliance on this since it was not originally built nor inspected to verify adherence to the International Residential Code or the NEC. We are trying to renovate it to be considered to be a code-compliant single family residence. - Craig Grant

  4. Land Use Data for US Solar Farms

    Associated Project(s): 

    National Renewable Energy Laboratories conducted research into solar land use requirements, but were unable to find a comprehensive evaluation from the literature. NREL created this report to analyze data related to land use in large solar arrays. The paragraph below explains the efficiency of land by type of solar project, and the link takes you directly to the report.

    Generation-weighted averages for total area requirements range from about 3 acres/GWh/yr for CSP towers and CPV installations to 5.5 acres/GWh/yr for small 2-axis flat panel PV power plants. Across all solar technologies, the total area generation-weighted average is 3.5 acres/GWh/yr with 40% of power plants within 3 and 4 acres/GWh/yr. For direct-area requirements the generation-weighted average is 2.9 acres/GWh/yr, with 49% of power plants within 2.5 and 3.5 acres/GWh/yr. On a capacity basis, the total-area capacity-weighted average is 8.9 acres/MWac, with 22% of power plants within 8 and 10 acres/MWac. For direct land-use requirements, the capacity-weighted average is 7.3 acre/MWac, with 40% of power plants within 6 and 8 acres/MWac. Other published estimates of solar direct land use generally fall within these ranges.
     

    https://www.nrel.gov/docs/fy13osti/56290.pdf 

  5. Solar Farm pending State Purchasing Officer (SPO) approval

    Associated Project(s): 

    The Solar Farm Purchase Agreement is waiting on approval from the State Purchasing Officer (SPO).  After the Board of Trustees approval in November 2012, the project went to the SPO's office.  It is now under review and Facilities & Services is working to answer any SPO questions.