Projects Updates for Topic: submission

Pages

  1. EGen008 Pursue Solar PPA recommendation - Submittal

    The eGen SWATeam submitted a recommendation, to the iWG, stating, "Explore the option of a PPA with a local solar developer."

    See attached the SWATeam recommendation, EGen008 Pursue Solar PPA, complete with comments from all the eGen SWATeam members.

  2. ECONS007 Energy Conservation Funding 2018 recommendation - Submittal

    The ECBS SWATeam submitted a recommendation, to the iWG, stating, "We recommend $10M per year (scalable) of funding for the next 5 years to implement critical projects that work in concert with energy performance contracts (EPC).  EPC contracts are fulfilled by specialized, accredited firms known as energy service companies. The university uses EPCs to manage complex projects targeting facilities with high energy use, such as laboratories, maximizing energy efficiency and addressing sizable volumes of deferred maintenance issues along the way.  The campus backlog on deferred maintenance is approaching $1 billion."

    See attached the SWATeam recommendation, ECONS007 Energy Conservation Funding 2018, complete with comments from all the ECBS SWATeam members.

    Also attached is the EPC Analysis report as submitted by the ECBS SWATeam.

  3. PWR012 Purchasing Representation recommendation - Submittal

    The PWR SWATeam submitted a recommendation, to the iWG, stating, "A staff member on the University of Illinois Purchasing Division commit to regularly attend the meetings of the Purchasing, Waste, and Recycling SWATeam."

    See attached the SWATeam recommendation, PWR012 Purchasing Representation, complete with comments from all the PWR SWATeam members.

  4. PWR013 Zero Waste Coordinator recommendation - Submittal

    The PWR SWATeam submitted a recommendation, to the iWG, stating, "We recommend that a full-time Zero Waste Coordinator is hired."

    See attached the SWATeam recommendation, PWR013 Zero Waste Coordinator, complete with comments from all the PWR SWATeam members.

  5. Trans008 Mode Share Survey recommendation - Submittal

    The Transportation SWATeam submitted a recommendation, to the iWG, stating, "iSEE should facilitate and fund, if any funds required, an updated University District transportation mode-share study. The previous circulation study was conducted by the transportation group in the Regional Planning Commission (RPC), CUUATS. This was conducted in 2011. This recommendation is for the Transportation SWATeam to create survey questions and, with the help of iSEE, distribute the survey across campus."

    See attached the SWATeam recommendation, Trans008 Mode Share Survey, complete with comments from all the Transportation SWATeam members.

  6. Trans009 PAC recommendation - Submittal

    The Transportation SWATeam submitted a recommendation, to the iWG, stating, "The chair of the Transportation SWATeam will serve as a voting member of the Parking Advisory Committee."

    See attached the SWATeam recommendation, Trans009 PAC, complete with comments from all the Transportation SWATeam members.

    Attached Files: 
  7. Water005 Rainworks Design Lot F4 recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation, to the iWG, stating, "The appropriate campus units (Parking, Facilities and Services) should begin the process of implementing the award winning green stormwater redesign for parking Lot F4."

    See attached the SWATeam recommendation, Water005 Rainworks Design Lot F4, complete with comments from all the Water and Stormwater SWATeam members.

    Also, attached are the two supporting documents as submitted by the SWATeam.

  8. Water002 Cooling Tower Increase COC recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG stating,

    "We recommend that a small tonnage (< 700 tons cooling capacity) stand-alone cooling tower on campus operating at a water concentration cycle of less than 2.5 be operated using softened water under high pH/high silica conditions to demonstrate near zero blowdown operation."

    See attached the SWATeam recommendation, Water002 Cooling Tower Increase COC, complete with comments from all the Water and Stormwater SWATeam members.

  9. Water001 BIF Greywater Meter recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG stating, 

    "Monitoring the water usage in the Business Instructional Facility (BIF). Specifically, both the total water use and the amount of water used by the raw water system should be measured and the data made available to the campus community.

    BIF is unique in that it was constructed with a separate raw water system that conveys non-potable water to be used for purposes such as flushing toilets. While the system is in place inside the building, it was never connected to an outside source of non-potable water. Use of non-potable water for purposes such as toilet flushing, landscape irrigation, cooling, etc. is recognized as a sustainable practice (e.g., Asano et al, 2007; EPA, 2012). Data to quantify the impact this could have on water use at UIUC, however, is largely unavailable. Metering the raw water system at BIF would provide data about the temporal total and non-potable water demand at a typical campus class/office building. These data would be valuable to consider whether such systems should be considered in future campus construction and renovation.

    F&S installed a temporary meter to measure the flow to the raw water system and operated this meter for approximately one month (April – May 2016), so this recommendation has already been demonstrated to be feasible. However, because building usage is highly variable over the course of an academic year, we recommend that this should be a permanent installation. We also recommend that the data be made available to the campus community to encourage consideration of such water reuse options."

    See attached the SWATeam recommendation Water001 BIF Greywater Meter complete with comments from all the Water and Stormwater SWATeam.

  10. Water003 Design Center Greywater Piping recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG stating,

    "We recommend that the Siebel Design Center should be designed to include plumbing to supply non-potable water to be used for toilet flushing. The system could be connected to the potable water supply until such time as a viable non-potable source (e.g., the campus raw-water lines) is available. At that time the non-potable lines could be connected to the non-potable source at a small expense. We also recommend that a meter be installed to monitor the amount of water delivered to the non-potable system and that these data be made available on the Dashboard operated by Facilities and Services."

    See attached the SWATeam recommendation, Water003 Design Center Greywater Piping, complete with comments from all the Water and Stormwater SWATeam members.