You are here

Projects Updates for Topic: Uncategorized

Pages

  1. Meeting Notes - 9-18-2017

    The iCAP Working Group met and discussed the following items:

    1.     Welcome to New Members

    2.     SWATeam Updates

    3.     Green Labs Program Update

    a.     Overview of Green Labs Concept

    b.     History of SWATeam Recommendation and Assessment

    c.      Green Labs Best Practices From Peer Institutions

    d.     Open Issues for Discussion

  2. Call To Recycle Program Results

  3. A Model Program for Reducing Water Waste on Campus

    As collegians head back to campus this fall it means campus water use will spike, so ISTC has released a video on a model program which dramatically cut water waste with a student-directed behavior change campaign. Loyola University Chicago implemented its “Gallons Saved and Shared” project with the help of a grant from ISTC’s Billion Gallon Challenge. Student interns and volunteers planned and executed fixture upgrades across much of the campus and designed a awareness/behavioral campaign with the expertise of psychology majors. In addition, Robyn Mallett, associate professor of psychology and her colleagues, were able to study the responses to produce scientific insights. A college campus is an ideal setting to build a culture of sustainability that can follow graduates throughout their lives. The experience of “Gallons Saved and Shared” is a model that can be considered to produce conservation results on other campuses, said Aaron N. Durnbaugh, Loyola’s director of sustainability.

  4. Meetings with Building Experts

    Associated Project(s): 

    With the finalized format of the energy report card and the compiled major events documented in Facilities and Services’ records, Ms. Morgan Johnston, Ms. Barnes, and I scheduled meetings with facilities staff who have the most knowledge about how each building works. This week, we talked to Ms. Mylinda Granger, Ms. Pat Malik from Disabilities Resources and Educational Services; Mr. Greg Anderson from Temple Hoyne Buell Hall; and Ms. Carol Young, Ms. Kari Cooperider, and Mr. Steve Hess from the Business Instructional Facility. They shared important information and wanted to help share the report with building occupants.

     

    Next step is to revise the draft report cards based on these meetings. In the next few weeks, more meetings will be scheduled.

     

  5. Report Card Layout Finalized

    Associated Project(s): 

    During this week’s meeting, Ms. Johnston, Ms. Barnes, and I finalized the layout of the energy report card. The front of the card consists of 3 graphs -- annual energy consumption from 2008 to 2017, monthly energy consumption of the most recent fiscal year 2017, and annual potable water consumption from 2008 and 2017. Notable events (such as retrocommissioning) associated with changes in trends are also included. The back of the card consists of 3 sections -- building systems, iCAP goals & current progress, and future actions.

     

    Meanwhile, I went through documents obtained from Facilities & Services regarding major projects in each of the 10 buildings. Next week, we will meet with building managers to discuss some questions about specific building systems.

     

Pages