  1. Water004 GSI Standards Parking Lots recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG, stating, "The Facilities and Services Standards for Parking and for Stormwater Systems should be revised to include a greater emphasis on sustainable design Green Stormwater Infrastructure (GSI) for stormwater management. This revision will align these standards with the newly adopted 2017 Campus Master Plan."

    See attached the SWATeam recommendation, Water004 GSI Standards Parking Lots, complete with comments from all the Water and Stormwater SWATeam members.

  2. Illini Union cooling towers removed

    The Illini Union has demolished its old cooling towers for HVAC in the past 15 years, and recently demolished the old evaporator cooling system for the refrigeration chilling water in 2017. Almost all of our HVAC is now on DDC, with the exception of AHU’s 1, 2, & 3 in the South Building attic, and AHU-21 in the North Building NW subbasement.

  3. Water005 Rainworks Design Lot F4 recommendation - Transmittal

    The iCAP Working Group transmitted the Water SWATeam recommendation to do a feasibility study for implementing the award winning RainWorks Challenge student design in parking lot F4 on campus.

    See attached iWG assessment.

    See SWATeam recommendation Water005 Rainworks Design Lot F4 here.

  4. BIF Greywater Meter Recommendation - approved

    The Water and Stormwater SWATeam recommendation to install a real-time water meter on the greywater pipes in the Business Instructional Facility has been approved by F&S leadership.  This project will proceed with funding from the Student Sustainability Committee and F&S Utilities & Energy Services.

  5. archived info - previous project description

    Associated Project(s): 

    The Business Instructional Facility (BIF) was designed for future use of greywater, which is raw (untreated) water. Although the building is fed from the potable water supply, there is separate piping for the urinals and water closets in the building. Utilities does not yet have a greywater system in place. When such a system becomes available, the connection in BIF that serves its fixtures can then be transferred to the greywater supply.

  6. Red Oak Rain Garden Renovation Stakeholder Meetings

    Associated Project(s): 

    Specific stakeholders were invited to join a workshop on July 11, 2017 for stakeholder input to the rennovation design of the Red Oak Rain Garden.

    --------------------------------------

    You’re invited to a series of two facilitated meetings seeking input from stakeholders about the Red Oak Rain Garden.

    Red Oak Rain Garden was installed 10 years ago as part of Tony Endress’ NRES classes. As of this year, the Extension Master Gardeners and Master Naturalists have an agreement in place with F&S Grounds to volunteer with the garden. Although the garden still performs well keeping water off of the pedestrian sidewalk, approximately 90% of the original plantings did not survive. We are working on a renovation plan that will enhance its aesthetics and multi-functionality. But, how exactly does the space function presently? What would be ideal?

    This is where you come in. As either a campus neighbor, student, volunteer, and/or stormwater-related professional, we seek your input that will inform the garden plan.

    Meeting 1: July 11 (Tue) 3 – 4:30 PM ACES Library, Monsanto Rm. Agenda: Provide background/history, ask questions, and present preliminary design direction options.

    Meeting 2: July 20 (Thu) 3 – 4:30 PM ACES Library, Heritage Rm. Agenda: Present refined design options based on feedback from Meeting 1 and seek preferences.

    IWRC intern/MLA Candidate Cameron Letterly will lead the sessions along with a facilitator to guide discussion.

    There will be an opportunity to provide input online for those that cannot be present.

    Please feel free to forward to invitation to others who have an interest in this garden.

    Thank you,

    C. Eliana Brown

    33 NSRC, MC-635, 1101 W. Peabody Dr., Urbana, IL 61801  217-265-0760

    Illinois Indiana Sea Grant  University of Illinois Extension  Illinois Water Resources Center

  7. OMA representatives review stand-alone cooling towers

    Water Station Foreman, Shawn Young, indicated today that there are two remaining stand-alone cooling towers on campus buildings maintained by F&S: Temple Buell Hall and the Personnel Services Building.  One of these (Personnel) is scheduled to be added to the central chilled water loop in 2020, according to the Utilities Energy Production and Distribution Master Plan.  Base on that discussion, Morgan Johnston will be following up with the Water SWATeam to let them know that because there are so few remaining stand-alone cooling towers, this is not a high-priority item to pursue.

  8. Water & Stormwater SWATeam Meeting Minutes 2/2/2017

    Review of pending recommendations: BIF Greywater, Increase Cooling Tower COC, Design Center Greywater Piping. Discussion on possible edits to the SWAT/iWG process. Student members will submit proposal to Student Sustainability Commision for apermanent meter to measure BIF greywater use. The Water SWATeam will meet every other week and will have a joint meeting with the Agriculture, Land Use, Food, and Sequestration (ALUFS) SWATeam this semester. 