  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Funding Letter - Geothermal TRT

    The applied for funding will be used in the construction of a Thermal Response Test unit for use in the Geothermal Pilot project that is currently being implemented on the UIUC Campus. The overall goal of the project is to assess the viability of geothermal heat exchange on this campus as well as the best implementation of this technology. The Thermal response test unit will measure the ability of the local geology to support geothermal heat exchange in the future. The unit will be designed to be used in all future geothermal projects. This project is student-led, and development and construction of the Thermal Response Test Unit will be conducted entirely by University of Illinois students. This proposal directly funds: 1) Construction Supplies 2) Transportation Costs.

  2. EGEN SWATeam Meeting (4.13.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Ximing Cai's [in attendance] vision for iSEE and SWATeams
    • Developing a recommendation to expand UIUC solar farm.
    • Developing a recommendation for another clean energy PPA
    • Cost savings for geothermal systems and opportunities for implementation at solar farm and new building sites
  3. EGEN SWATeam Meeting (3.30.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Performing preliminary assessment for clean energy PPA
    • Fact sheet using solar farm as basis to estimate land needs and costs of additional solar farm to meet iCAP goal
    • Update on biomass boiler at energy farm
    • Identifying opportunities to purseu implementation of ground source heat pump (GSHP) technology on campus.
  4. EGEN SWATeam Meeting (3.10.17)

    The EGEN SWATeam held another bi-weekly meeting. Topics covered include:

    • Associate Director for Campus Sustainability Ximing Cai and his vision for iSEE
    • Biomass boiler at Energy Farm
    • Opportunities for Geothermal on campus
  5. EGEN SWATeam Meeting (11.9.16)

    The EGEN SWATeam held their fourth meeting for the Fall 2016 semester. Topics covered include:

    • Guest presentation by Yu-Feng Forrest Lin to discuss his work on investigating campus geothermal properties
    • View draft recommendation for Petascale offsets
    • Review draft recommendation for on-campus solar
  6. Geothermal Profile Project

    Beginning Fall 2016, a team at the Illinois State Geological Survey (ISGS, a division of the prairie Research Institute) led by Illinois Professor Yu-Feng Forrest Lin is conducting a series of detailed observations of the geothermal profile on campus - including high-resolution temperature profiling and thermal analysis. The team will drill to 330 ft and install a geothermal loop and fiberoptic cables. Results will help determine the feasibility of implementing geothermal systems on campus by identifying costs and possible challenges.

    Professor Lin has coordinated with faculty from the University of Wisconsin to incorporate lessons learned from their implementation of a geothermal exchange system at the nearby EPIC health care systems campus in Verona, WI.

    Professor Lin's team began drilling on 9/19/16. Daily drilling progress is logged and can be found by clicking this link.

    Attached Files: 
  7. Geothermal Profiling Funding Agreement

    Given the University of Illinois’ existing reliance on coal-fired steam heating for many buildings, significant changes to campus infrastructure will be required in order to move to being truly carbon neutral. One possible option is geothermal heating, but there is somewhat of a lack of information about the feasibility of geothermal systems on campus.

    This project will conduct a series of high-detail observations of the geothermal profile of campus and analyze the data. The results of the study will help identify the costs and possible challenges associated with adding a significant amount of geothermal heating systems to campus.

  8. Allerton Park Geothermal_Funding Award and Acceptance

    This project seeks to significantly reduce Allerton Park’s net energy usage while, at the same time, promoting clean, renewable energy.  This will be done by converting the facility’s most inefficient and outdated heating and cooling system, located within the Gatehouse building, to geothermal heating and cooling.  As a U of I entity, Allerton Park strives to lead the way in upholding the University’s climate commitment by proactively encouraging sound and sustainable building principles.  As a climate leader, Allerton Park is committed to encouraging alternative energy initiatives, improving energy efficiency, and engaging students in supporting alternative sources of energy. 

  9. Allerton Geothermal Project Funding Letter

    This proposal seeks to install a geothermal system at the Evergreen lodge and Retreat Center. The Evergreen Lodge is a 2828 sq. ft. structure used as lodging facilities for retreat center guests. The installation will result in energy savings of ~ $2,000 annually and provide the University with experience in handling geothermal installations – none of which are currently installed at the University. This project is also being supported by grant funds from the Department of Commerce and Economic Opportunities. Committee funds will be utilized for purchase and installation of equipment, such as a ground source heat pump unit, as well as drilling of borehole heat exchange pipes. Additionally, Allerton park has agreed to install an on-site educational display about geothermal energy. The Student Sustainability Committee is in favor of funding a grant in the amount of $18,000.

  10. Open Geothermal at ISTC Project Funding Agreement

    The goal of this project is to conduct a feasibility study regarding installing an open geothermal loop underneath the Illinois Sustainable Technology Center.  The open geothermal loop would take water from one of the many nearby aquifers and only introduce heat into the system.   The project will increase awareness of geothermal systems, determine the physical and chemical attributes of the aquifer, and study integrating the geothermal system with the current HVAC system.  The ISTC hopes to decrease their energy use and greenhouse gas emissions by 25%-50%. The ISTC would test the procedure on this building, but hopes to extend it to other campus buildings.  Thus, the Student Sustainability Committee is in favor of funding the full requested amount of $27,000.

  11. Project kick off

    Associated Project(s): 

    The kickoff meeting for the ISTC geothermal study was led by Todd Rusk at ISTC on March 9, 2009.  The agenda was 1) to discuss the overall project objectives, tasks, and requirements and 2) to begin preparations for drilling the test wells.

    Participants included: Tom Abram, Eliana Brown, Kenneth Hlinka, Thomas Holm, Michael Jeffords, David Larson, Tim Lindsey, Kent Reifsteck, Bill Shilts, Douglas Walker, and Angela Wisehart.