You are here

Project Updates for collection: 2010 iCAP F&S projects

Search

Search tips:

  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. dockless bike sharing article

    Associated Project(s): 

    http://www.news-gazette.com/news/local/2018-05-07/ui-officials-working-incentives-keep-shared-bikes-populated-areas.html

    UI officials working on incentives to keep shared bikes in populated areas

     

     

    CHAMPAIGN — As a dockless-bike-sharing program inches closer to reality in Champaign-Urbana, University of Illinois officials are working on an incentive program to ensure more bikes rented on campus stay in populated areas.

    The concept, in general, allows people to rent bikes anywhere in town rather than at a fixed location. The two cities and the UI are working on an intergovernmental agreement to have mostly the same rules.

    Lily Wilcock, active transportation coordinator for the UI, said the campus's rules will require the bikes to be returned to a rack so as not to block sidewalks or entrances to buildings, and the UI is working with bike-share companies to make that easier.

    "One of the concerns we had as the University of Illinois was, what do you do if someone just rides it to their house and then they leave it there?" Wilcock said. "Some of the companies have responded to that, in that they've been using in other cities an incentive program. They've been allowing someone to ride the bus out to an area to get the bicycle, and then they get a free ride back to leave it in a more populated area. ... And then they get incentives like a certain amount of ride credit."

    Wilcock said a dockless-bike-sharing system could launch on campus in the fall.

  2. EGen008 Pursue Solar PPA recommendation - Submittal

    The eGen SWATeam submitted a recommendation, to the iWG, stating, "Explore the option of a PPA with a local solar developer."

    See attached the SWATeam recommendation, EGen008 Pursue Solar PPA, complete with comments from all the eGen SWATeam members.

  3. Weekly Update

    All, last Tuesday was BIKE TO WORK DAY! It was great! Great weather, great turnout, great conversation, great blindingly bright Vision Zero t shirts. I even sold some tubes and lights here at the Bike Center during the event and helped with some minor tune-ups. Peak times—no surprise—was 8:30 – 9am. After that a few stragglers hung around until  l0.

     

    On Saturday we had the Bike Rodeo at the ARC parking lot. While we didn’t have the huge turnout we were hoping for, the event ran really smoothly and we were able to educate and teach a lot about bike safety and bike-handling skills. Nothing beats showing a kid who’s barely taller than a bike pump how to air up their tires. Needless to say, that was a team effort.


    This week will be a major shop clean and purge as we’ve received another 8 or so bikes from Champaign Cycle that are on-the-whole quality bikes that need somewhere to be stored. And last week with the doors open a lot of leaves and debris got blown into the shop, so that’ll all need cleaning up as well.

     

    Numbers:

    Visitors: 70
    Sales: $828.60
    Bikes (refurb): 1 for $160
    Memberships: 5 for $150
    Tire/tube: 16 for $89

     

    Thanks!

    • Jake Benjamin
      Campus Bike Center Manager
  4. Water004 GSI Standards Parking Lots recommendation - Submittal

    The Water and Stormwater SWATeam submitted a recommendation to the iWG, stating, "The Facilities and Services Standards for Parking and for Stormwater Systems should be revised to include a greater emphasis on sustainable design Green Stormwater Infrastructure (GSI) for stormwater management. This revision will align these standards with the newly adopted 2017 Campus Master Plan."

    See attached the SWATeam recommendation, Water004 GSI Standards Parking Lots, complete with comments from all the Water and Stormwater SWATeam members.

  5. iWG meeting minutes April 9th, 2018

  6. Final project reports for Fall 2017

    The CEE 398 Project Based Learning and the Sustainability Minor's ENVS 492 Capstone students completed their nine fall 2017 reports.

    There were five projects completed for capstone partners:

    1. Energy Dashboards for Accenture
    2. Sustainable Development Goals (SDGs) for Johnson Controls
    3. Food Hub Study for The Land Connection
    4. Sensors and Green Buildings for CERL
    5. Biomass Life Cycle Cost Analysis (LCCA) for Chip Energy

    There were four other projects completed by CEE students:

    1. Rain Garden Design
    2. Solar and Green Roofs Analysis
    3. Food Waste to Energy
    4. ADA Sidewalk Repair Cost Analysis
  7. Funding Approval for Campus Tree Inventory

    Evan De Lucia and Helen Coleman approved $70,000 of funding from the Carbon Credit Sales Fund for Campus Tree Inventory.

     

    The emails of approval are attached below.

  8. SSC funds occupancy sensors

    Bevier Hall currently has a number of spaces served by obsolete thermostat controls. While efforts to improve scheduling for heating and cooling have made improvements to energy consumption, the installation of occupancy sensors would improve the efficiency of the HVAC system, reducing energy use without sacrificing user comfort. This funding provides resources to install new occupancy sensors in 25 lab, classroom, and office spaces in Bevier Hall. When completed, the heating and cooling system will be able to work more efficiently, eliminating the need to constantly provide conditioning for unoccupied spaces. Individual spaces will have better temperature control, therefore improving occupant comfort and increasing productivity. This is a Student Sustainability Committee supported project.

  9. Updated LEED requirements

    Associated Project(s): 

    The previous project description began with this statement: "The University has adopted LEED Gold certification as a part of their design standards on all new construction."  However, the Facility Standards and the Campus Master Plan were not aligned with each other.  During the update to the Facility Standards and update to the Campus Master Plan in 2017, the campus leadership determined that the appropriate requirement for new construction buildings is LEED Silver, to comply with minimum state legal requirements.

  10. Archived info - 2010 iCAP LEED goals

    Associated Project(s): 

    The 2010 iCAP included a focused effort on the use of LEED Certification to incorporate sustainable design in new capital construction on campus.  In the 2015 iCAP, campus sustainability advocates recognized that "While the utilization of current building certification programs such as LEED has helped raise awareness of sustainable building standards, the campus could accelerate progress in reducing building energy use by shifting to performance based building standards for new buildings and major renovations."  The 2010 iCAP LEED goals are documented here, for the archive.

    2010 iCAP LEED Goals:

    Require all new construction to be LEED Platinum certified by FY15:

    The LEED certification requirements were increased in fiscal year 2011 to require Gold level certification for all new projects.  This has increased the visibility and sustainability of all new campus buildings.  There is a proposal from the 2010 iCAP to increase the certification requirement to Platinum level in fiscal year 2015.  This increase would require additional funding for new building projects, and in some cases there may be conflicts with building codes or campus Standards.  

    Completed LEED Goals:

    Incorporate LEED principles into Facility Standards:

    The Facility Standards for campus have been updated to incorporate many LEED principles.  As of 2012, a building that meets all the Facility Standards, will qualify for a LEED Silver designation.  Additionally, new buildings, additions, or major renovations are required to meet LEED Gold certification.  The additional points to acheive LEED Gold are selected by the individual project teams, rather than prescribed specifically in the Facility Standards.

    The 2010 U of I Facilities Standards have been published and are currently based on LEED Gold certification.  The U of I Facilities Standards require compliance with all 8 Required Prerequisites and several additional Credits listed in the LEED Rating System.  The Standards list some minimum technical requirements and make recommendations pertaining to energy conservation strategies, but allow the AE the flexibility to determine how the LEED Gold certification is obtained.

    Require all new construction to be LEED Silver certified by FY10:

    LEED Silver certification has been required for all new campus buidings since 2008, when the iCAP was signed. Thee are four levels of LEED certification: certified, silver, gold, and platinum.  Silver certification requires a mimum of 50 LEED points.  The Ikenberry Commons Student Dining and Residential Programs (SDRP) building and the phase A of the new residence halls in Ikenberry Commons is also LEED Silver certified.  This designation is required for all buildings that were planned or begun before 2010.  While many of the buildings planned at that time are completed or in construction, there are some future buildings planned before 2010, which will only be required to meet LEED Silver status.

    Require all new construction to be LEED Gold certified by FY11:

    With the successful attainment of LEED Silver certification for some campus buildings, the Campus advanced the LEED certification requirements to a minimum of Gold certification at the beginning of fiscal year 2011.  All projects which began the planning process after May 2010 are required to be LEED Gold certified.  To acheive LEED Gold, the construction or renovation project must qualify for a minimum of 60 LEED points.

Pages

Subscribe to