You are here

Projects Updates for Solar Farm 2.0

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.

Pages

  1. Solar Farm 2.0 to Nearly Triple on Campus Renewable Energy Production

    Construction of a new 54-acre, 12.1 megawatt (MWdc) Solar Farm is approved by the University of Illinois Board of Trustees as the sole member of Prairieland Energy, Inc. Referred to as “Solar Farm 2.0,” the new utility-scale array to be located north of Curtis Road, between First Street and U.S. Route 45, will produce approximately 20,000 megawatt-hours (MWh) annually, almost tripling the university’s existing on-site renewable energy generation. Solar Farm 2.0 will generate the equivalent electricity use of more than 2,000 average American homes.

    Sol Systems, LLC, will design, build, operate, and maintain Solar Farm 2.0, for the duration of a 20-year contract which includes power purchase and land lease agreements, and an option to buy the system at the end of the term.

    https://emails.illinois.edu/newsletter/234685.html

  2. Next steps phone call

    Morgan White and Joyce Mast discussed next steps for acheiving Net-Zero status for the ECE Building.  Mike Marquissee is working on a draft MOU about using Solar Farm 2.0 Renewable Energy Certificates (RECs).

    Joyce is seeking student input about what should go on the ECE Building interactive display.  If you are interested in working with her on this, contact her at jmast@illinois.edu

  3. Preferred Vendor selected

    Associated Project(s): 

    The evaluation committee has selected a preferred vendor to develop Solar Farm 2.0, and the Chancellor's office approved moving forward with contract development. PEI will work with this vendor to complete the next steps of the award process. The vendor name will be announced upon approval of the contracts in fall 2019.

  4. Sustainability Council meeting 04-30-2019

  5. Meeting Minutes for iWG February, 2019

  6. Capacity of distribution lines

    Associated Project(s): 

    U19005: Electrical-Medium Voltage Power Distribution Study Updates - should start in mid-September - to evaluate capacity of power distribution line connected to proposed solar farm 2.0 site.

Pages