You are here

new bikeways installed

4.5 Percent of Proposed Bikeway Facilities Installed

This metric represents the percent of bikeway projects that were proposed in the 2014 Campus Bike Plan that have been fully installed.  The numerator is the # of finished projects, and the denominator is the total # of proposed projects.  Please note: the actual implementation may be slightly different than proposed in the 2014 plan.  This will not include study areas.  Also, if a proposed project was broken into two parts and one part was installed, then the # of proposed areas in the denominator will be increased by one.

Subscribe to RSS - new bikeways installed