2 bins placed at Harding Band
P10H08409 north of main hallway and P10H08410 south of main hallway.
P10H08409 north of main hallway and P10H08410 south of main hallway.
P10E62230 placed in the basement, P10H08411 placed on second floor, and P10H08412 placed on third floor.
P10H08408 placed on first floor near room 180, P10H8407 placed on second floor near main stairs, and P10H8406 placed at the east stair main entry.
On Friday, February 17, the bin order from MAX-R arrived at the Waste Transfer Station. 20 26-gallon bins (standard size) and 8 18-gallon (slim) bins arrived.
P10G97104 between 206 and 204 in hallway.
The Undergraduate Library rehomed 6 3-bins at the onset of redevelopment:
Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal. ~Sydney Trimble
The master list for indoor 3-bin containers has been updated. This list includes all 3-bin station deployments, with information regarding the building, floor, and P-Tag associated with each individual bin. If applicable, additional information regarding their location is provided as well.
See the attached file to review the updated master list for the 3-bin containers.
Hi Morgan!
Just wanted to provide a wonderful update on Indoor bins for the iCAP portal: The campus has 180 out of 200 available multi stream bins deployed in 56 different campus buildings. According to the iCAP metric, we are 1/3 of the way to our FY24 goal.
In the future, I think the iCAP team should consider changing the metric from number of buildings to number of deployed bins because not all campus buildings would be applicable for these bins. Especially if the buildings are offices, residential, or extension related. Orchard Downs and
I also went ahead and updated the bin location master list that came with the project so your team can upload it. It was outdated and I have upgraded the layout of the list so it is easier to find information.
Best regards,
Syd Trimble
F&S Waste Management Intern
fandssydneyt2@mx.uillinois.edu | Skype: (217) 333-1128
Garage & Carpool, Office D-3
In Office primarily Monday, Tuesday, Thursday afternoons
University of Illinois Urbana-Champaign
Environmental Sciences - 2022
On March 3, 2022, it was recorded that 56 buildings across campus have at least one of the new 3-bins.
On October 20, 2021, the 2021 Energy Conservation Incentive Program (ECIP) Award Winners were announced at the Campus Sustainability Celebration!
UIUC is home to a total of 10 winners and honorable mentions, as listed below according to their categories:
See the attached file to read the official announcement of 2021 ECIP Winners, including the locations' % improvements and monetary savings.
All are invited to the 2021 Campus Sustainability Celebration and appreciation event! Meet and network with your peer sustainability advocates and hear about exciting campus sustainability progress! Since the event is in person, please be prepared to wear a mask and show your Safer Illinois app or equivalent status. If you can't make it in person, watch the livestream on YouTube! >>>
October 20, 1–4 pm • National Center for Supercomputing Applications lobby, 1205 W. Clark St., Urbana
Julie Wurth • Institute for Sustainability, Energy, and Environment
SSC received a semesterly report for Spring 2021 for FLB Garden Renovation on 9/11/2021. Please see attached.
On June 30, 2021 it was recorded that 24 buildings across campus now have at least one 3-bin.
Brent Lewis did the purchase for seeds ($86.90) for the Green Roof on the Foreign Language Building, and delivered them to the students, c/o Joey Kreiling, on April 7, 2021.
The students are now growing these seeds in greenhouses, to be planted later this year.
I would note that the room level controls at the National Soybean Research Center have been upgraded to DDC in the past year. We plan to do this in the ACES Library in 2021. We have invested in Turner Hall w/ control upgrades and RCx work. The Ag Engineering building saw a recent project last year to upgrade to DDC controls and replace VAV boxes. ~Karl Helmink, F&S RCx, january 2021
iSEE and F&S are excited to invite you to the Campus Sustainability Celebration 2020! This is an annual event that is especially exciting this year with the signing ceremony of the Illinois Climate Action Plan (iCAP) 2020, (once every five years) and the presentation of energy conservation and Freezer Challenge awards. Everyone is invited and encouraged to stay afterward for a social-hour!
Campus Sustainability Celebration
October 20, 3 pm • Map
Meredith Moore • Institute for Sustainability, Energy, and Environment
This opportunity is available online.
Attached are the final project selection results for this year's Revolving Loan Fund, via Joshua Whitson. A big thanks to everyone who submitted projects and to those who support the Revolving Loan Fund.
The attached PDF and excel sheet for the initial request for funding for this project
SSC funded the Campus Bike Parking Overhaul, Phase 1 project in FY12 for $225,000. Please see attached the final report pertaining to this project.