Brent Lewis compiled the following to offer insight into (1) Campus Storm Peak Runoff, (2) Existing Green Infrastructures, and (3) Turf Lawn Irrigation information for campus.
List of Permeable Paver Installations on Campus:
Nugent/Ikenberry Complex |
|
Permeable concrete paving and pavers |
Electrical & Computer Engineering |
|
Permeable paver service area & East plaza |
Siebel Center for Design |
|
Permeable paver service area |
Bookstore (MCORE P4) |
|
Permeable paver sidewalks |
ISR |
|
Permeable paver sidewalks |
Hydrosystems / Newmark |
|
Permeable pavers |
Alma Mater |
|
Permeable pavers |
Henry Administration |
|
Permeable pavers |
Swanlund / John St. |
|
Permeable pavers |
Japan House Bike Parking |
|
Permeable pavers |
Altgeld Hall (future-2026) |
|
Permeable pavers |
Illini Hall (future-2024) |
|
Permeable pavers |
Coordinated Science Lab (future fall 2021-spring 2022) |
|
Permeable pavers |
State Farm Center |
|
Permeable pavers in the NE parking lot. (NW lot in planning) |
List of Underground Retention Facilities & Detention Ponds (On and Off-Campus):
Football Performance Center |
just south of building 1540, west of Fourth Street and north of Kirby Avenue |
Underground retention |
Ikenberry Commons |
between buildings 0084, 1248, 0079, and 0080 |
Underground retention |
IGB |
just west of 1080, at roughly the northwest corner of Gregory Drive and Goodwin Avenue (just east of "Mathews Avenue extended") |
Underground retention |
Siebel Center for Design |
east of 1517, between Fourth Street and Sixth Street, and Peabody and Gregory |
Underground retention |
Stadium Soccer Fields |
northwest corner of Stadium Drive and First Street |
Underground retention |
Siebel Center |
- |
Underground retention |
Noyes |
- |
Underground retention |
Bielfeldt Detention Pond |
west of 0379 against Fourth St in the circle drive |
Detention pond |
Windsor Road Detention Basin |
southwest corner Windsor and First St. |
Detention pond |
South Research Park Detention Pond |
southwest corner St. Mary's and Oak St. |
Detention pond |
List of Irrigation Efforts On Campus:
- We have irrigated fields for both Athletics and Campus Rec.
- Athletics’ Bielfeldt and Ubben areas are irrigated
- The Research Park also has irrigation out there.
- The arboretum has irrigation, mainly at the Hartley Garden
- The President’s House is irrigated
- The Main Quad is irrigated, as well as the Bardeen Quad and North Quad
- Beckman Institute is irrigated
- The landscaped area around the Hallene Gateway is irrigated