Projects at this location

Project Description
Indoor Bin Update

This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency.

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.

SSC Projects

Sorry, there are no projects listed at this time.

Project Updates

  • 11/18/2024

    These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.

  • 11/8/2024

    Fabricated through our own mill shop. Cost to make two of these bins is attached.