Altgeld Hall
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Green Roof on Altgeld Hall |
The Altgeld Hall renovation project is expected to include a green roof. |
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
LED Exit Signs |
As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025. |
ICECF 2008 Lighting Retrofit [ARCHIVED] |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
Presentations with Energy Liaisons [ARCHIVED] |
To communicate within departments and colleges, we asked Energy Liaisons established by F&S to promote energy conservation to host presentations in their buildings which will include a display, information, and materials specific to your buildings. The first of these presentations were conducted during Sustainability Week, October 2011. The goal is to use the Energy Liaisons and various campus sustainability committees as grassroots contacts for initiatives such as energy conservation. |
Projects
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
11/18/2024These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.
-
11/8/2024Fabricated through our own mill shop. Cost to make two of these bins is attached.