As part of the Housing Lighting Retrofit, 453 T-12 fixtures in FARH Residence Hall's Food Service Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 71,429 hours.
You are here
Barton Hall
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Mobile Monitoring of Cognitive Change |
This program invites applications to design and implement research infrastructure that will enable the monitoring of cognitive abilities and age, state, context, or health condition-related changes in cognitive abilities on mobile devices. |
Housing Lighting Retrofit |
In the Housing Lighting Retrofit a total of 5,515 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures in housing buildings around the University of Illinois' campus. This will incur a total Annual KWh Savings of 791,331 hours. The total Simple Payback is estimated to be 2.81 years. |
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
2/25/2013
-
2/25/2013
As part of the Housing Lighting Retrofit, 126 T-12 fixtures in FARH Oglesby Residence Hall were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 19,868 hours.