Hi Paul,
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Project | Description |
---|---|
Infrastructure Security and Energy Restoration (ISER) |
This program applyies the Department of Energy's technical expertise to help ensure the security, resiliency and survivability of key energy assets and critical energy infrastructure. |
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
FY14 RCx |
In FY14, the Retrocommissioning teams completed ten buildings. |
ICECF 2009 Lighting Retrofit |
The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
FY12 SSC Bike Parking Upgrades |
In FY12, the Student Sustainability Committee approved $225,000 to upgrade a number of bike parking locations on campus. Facilities & Services is completing the work to upgrade these locations by the end of Summer 2013. |
Sorry, there are no projects listed at this time.
Hi Paul,
Hi Paul,