You are here
Music Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
FY09 RCx |
During the second year of Retrocommissioning (RCx), a second team was added in January 2009. The motto was now "Saving the Planet Two Buildings at a Time." In this fiscal year, the RCx efforts completed seven buildings. |
LED Exit Signs |
As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025. |
ICECF 2009 Lighting Retrofit [ARCHIVED] |
The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17. |
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
3/10/2017The Office of the Provost approved $75,000 in one-time funding for the next step in the LED Exit Sign retrofit project. The funding of $75,000 is for LED Exit Sign lighting replacement, additions, and new building surveys. Material and...
-
1/11/2017F&S Building Maintenance submitted the attached funding request to the F&S Director of Shared and Administrative Services for the next round of the LED Exit Sign projects.