These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.
You are here
Personnel Services Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Projects
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
11/18/2024
-
11/8/2024
Fabricated through our own mill shop. Cost to make two of these bins is attached.