You are here
- Home
- Table Installed and Inspected, Waiting on Solar Panel Installation
Table Installed and Inspected, Waiting on Solar Panel Installation
Posted by Alec McKay on September 29, 2021
A Belson recycled picnic table was installed and inspected.
The solar panels for the table are yet to be installed.
Pictures of the table are attached below.
The email regarding this event is also attached below.