You are here

Projects Updates for place: Chemical & Life Sciences Laboratory

  1. ARC approval

    Associated Project(s): 

    From: Lev, James R
    Sent: Monday, April 21, 2014 4:37 PM
    To: Geoffrey Chambers
    Cc: Eller, Jonathan Randall; Johnston, Morgan B; Architecture Review Committee
    Subject: RE: Approval for SSC Proposal: Shelter Bicycle Parking for CLSL and RAL

    Geoff:

    Thank you for your summary and request for review comments on your proposed project. 

    ARC finds no significant issues with the proposed locations of a cover bike shelter adjacent to the Chem Life Sciences Building.  

    ARC would want to consider shelter designs on a location by location basis.  The shelters may not be acceptable everywhere on campus.   Each site would need to be considered on its own merits and appropriateness of design.  We would like to see a proposal for these two suggested locations: size, location, number of racks, costs and the design.   We’d like to see what you have in mind. 

    Thanks for bringing this to our attention.

    Jim

Pages