FSI Hazmat Storage Building
Associated Project(s):
As part of the Lighting Retrofit #5, 20 T-12 fixtures in the FSI Hazmat Storage Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 2,278 hours. The simple payback for this project is 6.64 years.
As part of the Lighting Retrofit #5, the remaining 5,646 T-12 fixtures in the Main Library were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 849,998 hours. The simple payback for this project is 3.11 years.
As part of the Lighting Retrofit #5, 2,711 T-12 fixtures in the Natural Resources Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 424,466 hours. The simple payback for this project is 2.2 years.