You are here

Projects Updates for Shipping Containers for Bicycle Storage

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. Ventilation System Installed and Electrical Work In-Progress for the Shipping Containers

    Ventilation systems were installed in each of the seven shipping containers last week and electrical work is currently being done to add power to the shipping containers. There are also hooks installed to hang bikes on one side of the wall in each shipping container. 

  2. Work Order Created to Install 7 Metal Signs on the 7 Shipping Containers

    Work order #11257249 was created for for the Sign Shop to create and install seven (7) 18'x24' metal signs to be installed on each of the seven shipping containers for bicycle storage. These containers are located between the Abbott Chilling Plant and the Personnel Building. Attached is a png of the sign design for shipping container 1.

     

  3. Work Order Created for Removing Parking Blocks for Shipping Container Delivery

     Work order #11210322 was created for the Labor Shop to remove the parking blocks on the south-west side of the parking lot E-28 for shipping containers delivery in the gravel lot between the Abbott Chilling Tower and the Personnel Building. These parking blocks will have to be removed before Friday, November 22, 2024 and should be re-installed in the same spots after the delivery has been made, and no later than Friday, December 6, 2024. 

  4. Work Order Closed for Removing Sod and Installing ca-6 Rock

    Work order #11185318 for Construction Service Support to excavate and dispose of the existing sod where the new rock lot will go (approximately 5,096 sf of area no more than 4" deep and to furnish and install 6" thick of ca-6 rock on top of woven geotextile fabric was completed 8/28/24 and closed 9/26/24. This task cost $19,251.86.

  5. Work Order Created For Shipping Container Estimate

    Work Order #11178391 was created for Construction Service Support to provide a formal estimate for the 7 shipping containers and for the installation of a 6" rock bed with fabric. This is for the placement of shipping containers for bicycle storage in the lot immediately west of the Personnel Building along Gregory Dr. Attached is a pdf for the bicycle storage container layout and another pdf of the site layouts.