You are here

All Project Updates

Search

Search tips:
  • This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.


Pages

  1. eweek announcement

    Associated Project(s): 

    Campus Safety Study: Focus Group for Vision Zero (UIUC)

    As part of Vision Zero study, a survey was sent out to collect data about problematic locations within campus. To collect further data and gain insights, we are conducting a focus group. Please fill out this form if you are interested in attending the focus group. The focus group would be held over zoom and would be an hour long. The link to the zoom meeting will be sent in a later email. 

    Jacob Mathew • Department of Civil and Environmental Engineering

    baseline_wifi_black_18dp.png This opportunity is available online.

  2. Digital signs posted

    Associated Project(s): 

    Digital Signs were posted to the following locations from 9/18/20 to 9/24/20:

    1. Illini Union and Bookstore
    2. Campus Residence Halls and Dining Halls
    3. F&S
    4. BIF
    5. Campus Rec
    6. Beckman
    7. Architecture Building (FAA)
    8. Chez Wounded Veterans Center
    9. Coble Hall- Graduate College
    10. Law Building
    11. CSL
    12. DCL
    13. ECE
    14. Engineering Hall
    15. Foellinger Auditorium
    16. Huff Hall
    17. Industrial and Enterprise Systems Engineering building
    18. Loomis Laboratory
    19. Material Science and Engineering (MSEB)
    20. Micro + Nanotechnology laboratory
    21. Newmark Civil Engineering Laboratory
    22. Siebel Center
    23. Talbot Laboratory
    24. Vet Med Basic Sciences Building
    25. Vet Med Teaching Hospital
    26. EnterpriseWorks at Research Park
  3. Revolving Loan Fund: FY2020 Project Selection Results

    7 projects were approved during the FY2020 Revolving Loan Fund (RLF) project selection. At this time, final scoring results were determined as well. F&S will be beginning these projects soon and will start assessing their correlated utility savings.

    Due to COVID-19, the voting process was conducted via email as opposed to meeting in person. As a result of the success in the virtual voting process, future selections are planned to occur in a similar fashion.

  4. Article: Preservation of Century-Old Trees Near Siebel Center

    Associated Project(s): 

    Julie Wurth, iSEE Communications Specialist, released an article highlighting the preservation of century-old trees during the construction of the new Siebel Center for Design. These trees are rooted in the university's early history and serve as "remnants of a windbreak that protected a vast experimental orchard planted there in the late 19th century by botanist Thomas Jonathan Burrill, a pioneer in plant pathology and the third University of Illinois President (1891-94)."

    Read the article as a PDF in the attachments or proceed to its posting in iSEE's News Releases!

  5. eweek announcement

    The Crochet Coral Reef: Intersections of Math, Science and Art

    Margaret Wertheim is a writer, artist and curator whose work brings together art, math and science as evidenced in her Crochet Coral Reef, created through hyperbolic crochet. This talk launches the Urbana-Champaign Satellite Reef, Part of the worldwide Crochet Coral Reef project by Christine and Margaret Wertheim. Visit the project website https://uiucsatellitecrochetcoralreef.wordpress.com/

    September 17, 5:30 pm • Map

    Jennifer Bergmark • School of Art and Design

  6. Comments received from IEMA and FEMA

    We have received review comments from the IEMA and FEMA review of the Final Draft of the Champaign County Multi-Jurisdictional Hazard Mitigation Plan 2020 Update that was submitted for review on May 29, 2020.

     

    Susan Monte's plan is to address six required revisions needed to the Final Draft HMP Update over the next few days. She will reach out to current HMP Team members for assistance that may be required.

     

     

  7. Welcome SWATeams/iWG

    Dear SWATeams and iWG,

     

    We hope that you have had a smooth start to the academic year. Thank you for agreeing to serve on the iCAP teams (SWATeams) this year! You are an instrumental part of one of the seven teams: Zero Waste, Transportation, Energy, Land & Water, Resilience, Education, and Engagement (a new team this year)! You will soon receive an official charge letter from the iSEE interim director, Dr. Madhu Khanna.

     

    We would like to invite you to the annual kick-off event which will include an overview of the iCAP process, expectations of the teams, and status of past recommendations. This event will be held next Thursday, September 17 via Zoom from 4-5pm. An Outlook invitation will follow this email. This event is a fantastic opportunity to gain an understanding of how these teams positively impact campus, and also say “hi” to the other members which is especially important as we are encouraging greater collaboration between the teams this year.

     

    Secondly, please mark your calendars for the virtual Campus Sustainability Celebration on Tuesday, October 22 from 3-4:30pm. This will be an exciting event as the official approval ceremony of the iCAP 2020 by Chancellor Jones! Meredith will be sending Outlook invitations shortly.

     

    Please let us know if you have any questions. We look forward to working with you this year, and thank you again for your commitment to campus sustainability efforts!

     

    Best regards,

    Dr. Ximing Cai and Morgan White, iWG co-chairs, and Meredith Moore, Sustainability Programs Coordinator

  8. Tables, chairs, and hand sanitizers for all three locations

    Associated Project(s): 

    The work order was approved (WO #10813200) to place 7 tables, 15 chairs, 2 Hand sanitizer stations, 2 recycling bins for each of the following three locations:

    1. Alma Mater Plaza (intersection of Green and Wright St)
    2. Hallene Gateway (SW corner of Lincoln Ave and Illinois St)
    3. Campus Bike Center (51 E Gregory Drive, Champaign, IL)
  9. The Day After Tomorrow: Digging Into the Randolph Street Community

    Associated Project(s): 

    The Youth Climate Justice Forum presents this podcast series in which we will be trying to find ways for all of us to continue to work for climate justice during and after the coronavirus crisis. This week, Caroline and Theo interview Dawn Blackman, the steward of the Randolph Street Community Garden and a minister at the Champaign Church of the Brethren.

    https://youthclimateforum.wixsite.com/summit/podcast/episode/1c2d1b0f/th...

     

  10. F&S announcement and Press Release: U of I Joins National Bicycle Registration System

    Associated Project(s): 

    On September 1, 2020, the Facilities & Services Communications team published and announcement on the F&S website about the transition of UIUC's old bicycle registration system to a national bike registration system through Project 529. The announcement can be found here: https://fs.illinois.edu/resources/newsroom/2020/09/01/u-of-i-joins-natio...

    The F&S Communication team also sent out the press release for this change on September 1 evening. A pdf of this press release is also attached.

  11. LTN: Lawn Signs

    Associated Project(s): 

    The Lawn Signs were approved by Kristin McMurray on September 1, 2020. The Lawn Signs will be placed at 15 pre-determined locations on-campus from September 17th to September 24th (removed right after the event).

    The work order was approved to create the Lawn Signs on August 31, 2020 (WO #10811551).

  12. Lawn Signs

    Associated Project(s): 

    The Lawn Signs were approved by Kristin McMurray on September 1, 2020. The Lawn Signs will be placed at 15 pre-determined locations on-campus from September 17th to October 17th.

    The work order was approved to create the Lawn Signs on August 31, 2020 (WO #10811593).

Pages