Project | Description |
---|---|
Building Technologies Office |
The Building Technologies office leads a network of research and industry partners to continually develop innovative, cost-effective energy saving solutions in building design. Some of the relevant programs under the Building Technologies office include |
Structural and Architectural Engineering and Materials (SAEM) |
SAEM aims to enable sustainable buildings and other structures that can be continuously occupied and/or operated during the structure’s useful life. The SAEM program supports fundamental research for advancing knowledge and innovation in structural and architectural engineering and materials that promotes a holistic approach to analysis and design, construction, operation, maintenance, retrofit, and repair of structures. |
Styrecycle: Expanded polystyrene (EPS) recycling program |
Dart Container at 1505 E. Main St., Urbana, accepts expanded polystyrene (EPS), more commonly known by its brand name Styrofoam, for recycling. Departments are encouraged to take EPS there to recycle this bulky material. By doing so, we can reduce the volume of waste sent from campus to landfills and avoid the harmful environmental impacts of that practice. There is no charge to drop off EPS at Dart for recycling. There is currently no central funding source to pay for transportion of EPS to Dart, so departments need to arrange transport independently. |
Art- East Annex Studio 1 Daylighting |
The Art East Annex Studio 1 Daylighting is a proposed project to install skylights on the first floor of the Art East Annex Studio 1, which is primarily student studio classrooms and fabrication labs. This portion of the studio is a single story space, which makes skylights a great option. Skylights would be used to supplement and reduce the use of the overhead fluorescent lighting. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |