You are here
Transportation Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Building Envelope Pilot Project |
Based upon building energy modeling and actual results from residential projects we believe a 20-30% reduction in energy usage is achievable when the building envelope is properly installed and verified. We have many buildings on campus where the envelope should be inspected, tested, and appropriately improved to address the energy lost through improper installation and or maintenance. |
FY16 RCx |
In FY16, the Retrocommissioning teams completed six buildings. |
LED Exit Signs |
As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025. |
Lighting Retrofit #5 [ARCHIVED] |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
Project Updates
-
6/16/2025See attached the presentation used for the 2025 ECIP Awards Celebration
-
5/28/2024