Construct tile-drainage wetlands built at 5% wetland-to-watershed to reduce nitrate-N into Embarras River by 50%.
Associated Metric
No metric specified for this objective
Explanation
"Tile-drainage wetlands built at a 5 percent wetland-to-watershed ratio could remove nearly 50 percent of the nitrate-N that otherwise would enter the Embarras River (Kovacic 2007)."