Proefssor Baser shared that the data loggers are getting ready to be installed.
You are here
Civil Engineering Hydrosystems Laboratory
205 North Matthews Avenue
61801
Urbana
, IL
United States
Illinois
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Hydro-Systems Lab Energy Foundations |
Geothermal energy foundations will be installed this summer as part of the Department of Civil and Environmental Engineering’s (CEE) Ven Te Chow Hydrosystems Laboratory addition at the University of Illinois at Urbana-Champaign. Substantial completion of the renovation is expected in Summer 2020. |
Lighting Retrofit #5 |
In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years. |