Proefssor Baser shared that the data loggers are getting ready to be installed.
You are here
Hydro-Systems Lab Energy Foundations (In Progress)
Project History
Project Family
-
Geothermal on Campus
- Geothermal at President's House - Study
- Geothermal at Allerton Park
- Geothermal Monitoring Well on Bardeen Quad
- Geothermal Test Well at Energy Farm
- Geothermal at Gable Home
- Geothermal at WPP
- Geothermal at the Campus Instructional Facility (CIF)
- Geothermal at the Energy Farm
- Geothermal at the Fruit Farm Admin Building
- Hydro-Systems Lab Energy Foundations
- ISTC Geothermal Loop
- RIPE Greenhouse with Geothermal at Research Park
Project Team
-
Primary Contact:
Tugce BaserProject Leader:
Tugce BaserTeam Members:
- Mohamed Attalla
- Morgan White
Themes
-
Primary Theme: