You are here

Harding Band Building

1103 South Sixth Street
61820 Champaign , IL
United States
Illinois

This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.

Projects at this location

Project Description
FY17 RCx

In FY17, the Retrocommissioning teams addressed deferred maintanence for the following buildings.

LED Exit Signs

As part of the iCAP and LED Campus initiatives at the University, incandescent and flourescent bulbs in Exit Signs are being replaced with LEDs. This is part of the LED Campus commitment to replace all interior wayfinding fixtures on campus by 2025.

Lighting Retrofit #5

In Lighting Retrofit #5 a total of 32,993 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,414,849 hours. Fifty-five university buildings were involved in this part of the T-12 to T-8 Lighting Retrofit Project. The total Simple Payback is estimated to be 3.1 years.

Energy Conservation Incentive Program (ECIP)

For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets.  The  academic departments are supplied with utilities through the campus administrative budget.  For these departments, an incentive program has been implemented to encourage these units to conserve energy.