You are here

Illinois State Water Survey

2204 Griffith Drive
61820 Champaign , IL
United States
Illinois

This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.

Projects at this location

Project Description
ICECF 2009 Lighting Retrofit

The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh  Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17.

SSC Projects

Sorry, there are no projects listed at this time.

Project Updates

  • 4/15/2011

    As part of the ICECF 2009 Lighting Retrofit, 177 T-12 fixtures in the Abbott Power Plant were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 27,909 hours.

  • 4/15/2011

    As part of the ICECF 2009 Lighting Retrofit, 858 T-12 fixtures in the David Kinley Hall were replaced with the more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 84,223 hours.