These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.
You are here
Natural History Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
Natural History Building: LEED Gold |
The Natural History Building was certified LEED Gold on January 29, 2019. The project achieved 61 out of 110 points on the LEED v2009 New Construction scorecard, with a significant number of points from the Sustainable Sites, Water Efficiency, and Materials & Resources categories. |
ICECF 2008 Lighting Retrofit |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
SSC Projects
Sorry, there are no projects listed at this time.
Project Updates
-
11/18/2024
-
11/8/2024
Fabricated through our own mill shop. Cost to make two of these bins is attached.