Wohlers Hall
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Plastic Bag Recycling |
The goal of this project is to make plastic bag and film recycling more accessible to the campus community. 6 collections bins have been set up at 4 different buildings. After evaluation of the current setup, more drop-off locations may be added or changed. By completing this project, Plastic Bag Recycling will offer multiple benefits such as: |
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
FY09 RCx |
During the second year of Retrocommissioning (RCx), a second team was added in January 2009. The motto was now "Saving the Planet Two Buildings at a Time." In this fiscal year, the RCx efforts completed seven buildings. |
Water Fountain Retrofit |
The Illinois Student Senate Environmental Sustainability Subcommittee has a vested interest in promoting environmentally responsible campus policies and projects in an effort to encourage responsible and sustainable practices at the University of Illinois. One of the projects which our committee has been discussing since the beginning of the semester has been encouraging the student body to wean off of disposable water bottles and promoting reusable water bottles, with the greater goal of curbing litter and wasteful discarding of recyclable bottling materials. |
ICECF 2009 Lighting Retrofit [ARCHIVED] |
The ICECF 2009 Lighting Retrofit was the second round of the T-12 to T-8 Lighting Retrofit Project. A total of 33,192 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 5,335,909 hours. Thirty university buildings were involved in this round of the project. The total Simple Payback is estimated to be 1.17. |
Project Updates
-
11/18/2024These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.
-
11/8/2024Fabricated through our own mill shop. Cost to make two of these bins is attached.