Engineering Design preliminary meeting

Posted by Morgan White on December 11, 2013

Eva Sweeney, Robert Halverson, and John Summers from F&S Engineering Design Services met with Paul Foote and Morgan Johnston.  They discussed the SSC step two proposal for an EV charging station.  Robert had met with Michelle Wahl and Tom Skaggs from Parking. Eva will be the key electrical engineer for this project.

There was discussion about a connection from the parking meter to the electric charging station.  The meter could have contacts that would energize the charging station when the parking meter is paid. 

There was a question whether this proposal is for one or two charging stations which would take two or four parking spaces.  Morgan said she would check with Michelle about the quantity.  It was later clarified that the proposal is for one charging station, which would need two parking spaces.

Parking will have reduced revenue from the parking spaces.  A departmental space is $1980 per year.  Parking meters are currently charging $1.00/hour.  We need to be able to report on the effectiveness of this program, so we need to track the energy usage.  

There will be ongoing maintenance costs.  The Engineering design work can help understand these potential costs, once the specific charging station is selected.

This will go in parking lot B4. It will not be a leased space.

The SSC request is for $20k.

According to Robert, Michelle indicated that UA wants a trending report on usage.