You are here

EV Charging at Lot E15

Posted by Avni Sabharwal on March 19, 2025

8 new ChargePoint CT-4000 "Level 2" chargers were installed in Lot E15 when it underwent construction. These chargers have dual ports,  which enables a total of 16 vehicles to be plugged in at the same time.

Date Done: 
3/19/2025