June 5 update meeting

Posted by Sinead Soltis on June 5, 2023

Morgan White, Daphne Hulse, & Sinead Soltis met to review the completed outdoor bin survey, which maps out the bins currently installed on campus and can be found in an ArcGIS online format. Over the next two weeks, the sites with a proposed bin installation will be finalized to resume installation. A follow-up meeting will be held Wednesday, June 7th, to better understand what is needed to get work order started. As a note, about 40 bins have been installed out of the 74 ordered.

Update from Daphne Hulse 6/9/23: 43 dual bins were counted as installed on campus currently. A visit to storage showed that there are currently 80 dual bins still palletized (128 individual bins (64 pairs) located in PPSB shed and 32 individual bins (16 pairs) located outside near shed) and waiting for installation. According to the attached outdoor bin memo, 130 bins were originally purchased. We have 123 bins total accounted for (installed and palletized). 7 bins are unaccounted for. They may have been damaged/replaced.

Attached Files