Key Objective: 18. Retrocomissioning Strategic Plan

Retro commissioning, with revisits every 5 to 8 years to maintain.

Create a long term plan for complete retrocommissioning of campus, including revisits, and follow up programs.

Associated Metric

No metric specified for this objective

Explanation

"Commissioning for existing buildings (sometimes referred to as retro-commissioning or RCx) is a systematic process for investigating, analyzing, and optimizing the performance of building systems by improving their operation and maintenance to ensure their continued performance over time. This process helps make the building systems perform interactively to meet current facility requirements. The campus RCx teams have found a 29 percent average reduction in energy use and emissions for the 14 existing buildings (2,347,170 sq. ft.) they have examined. This success rate shows that there is enormous potential for this reduction strategy. Campus RCx activities have included: repairing and recalibrating sensors, valves and dampers, upgrading control systems, demand control ventilation, and implementing scheduling for air handling units, among others. The current RCx program is being augmented by several Energy Service Company (ESCO) contractors. A plan to revisit every building on a 5- to 8-year basis should also be instituted in order to maintain these savings. A direct-digital control command center to monitor temperature control and alarms to determine when systems fail or inappropriate temperature settings are being utilized will be constructed by the end of calendar year 2012. Based on the campus RCx program performance to date, savings proposed by SAIC for this section can be increased. The new target for RCx is 12 percent."

Associated Project

Theme

Project History

  • 9/15/2023
    Hi Jim & Kelly Jo, My intentions were to send this out last Friday after seeing the DKC email, I just didn’t get back to it before the end of the day. I just wanted to share the latest version 4.1 of LEED which shows the new requirements...
  • 3/21/2023
    Hello XMT, If you or your staff are planning to submit an application for Student Sustainability Committee funding this spring, please copy me and Lisa Peacock, so we can advocate and support the F&S applications during the committee review...