Key Objective: 17. Steam System Maintinence

Maintain steam system, including trap replacement, pipe insulation and cleaning ducts.

Maintain steam system, including trap replacement, pipe insulation and cleaning ducts to reduce energy loss by 2% per year for five years.

Associated Metric

No metric specified for this objective

Explanation

"This category includes conversion from constant air volume reheat to variable air volume, eliminating summer steam usage (reheat), heat recovery, variable speed drives for fans and pumps, and steam system maintenance (including trap replacement and pipe insulation). The target for other HVAC is 12.5 percent."

Associated Project

Theme

Project History

  • 4/24/2024
    Attached is information about the senior design project presentations scheduled for next Tuesday. The project that we have been helping with is scheduled to present at 8:30 on Tuesday in 4100 LuMEB, Abbott Enerdrape System. Mike Larson
  • 10/17/2023
     Hi Mark, I am going to assign an SSC project to you as the PM to take it through design and construction.  The construction can be done through Contractor Services, so this would normally go to a Planner.  However, it will be in...