Steam System Maintenance (Ongoing)

Description

  • The campus allocated $160,000 recurring to fund two Pipefitter FTEs to replace steam traps.  Subsequently, the Maintenance Division has added an additional two FTEs to the efforts.  
  • Ideally, steam traps will be replaced every five years, on average.
  • The SSC contributed $215,000 toward steam reduction at the Library – via PRVs, steam traps and controls.
  • The DCEO Boiler Grant is available to further support these efforts.

 

No description has been provided yet.

Project Team

  • Primary Contact:

    Morgan Johnston