You are here
- Home
- Total Purchased Clean Power
Metric: Total Purchased Clean Power
This metric represents the total clean energy used on campus each year, in megawatt-hours (MWh/year). It only includes clean energy actually used on campus, so we kept and retired the Renewable Energy Certificates (RECs). It also includes thermal energy from the solar thermal panels at the Activities Recreation Center and biomass from the Energy Farm, translated from BTUs to MWh.
Metric Chart
Total Purchased Clean Power
Annotations
- FY 2008:
Baseline
- FY 2009:
Production started at BIF
- FY 2014:
Production started at BRC
- FY 2015:
bought 20,000 RECs
- FY 2016:
Production started at the Wassaja and Solar Farm
- FY 2017:
PPA signed with RainSplitter Wind Farm in Nov 2016
- FY 2018:
Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power
- FY 2021:
includes first five months of Solar Farm 2.0
Tracking
Value | Applicable Date | Affirmed By | Annotation |
---|---|---|---|
52,335.20 | Jun 30 2022 | Morgan White | |
39,353.46 | Jun 30 2021 | Morgan White |
includes first five months of Solar Farm 2.0 |
30,636.00 | Jun 30 2020 | Morgan White | |
32,081.00 | Jun 30 2019 | Morgan White | |
30,703.88 | Jun 30 2018 | Morgan White |
Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power |
27,121.43 | Jun 30 2017 | Morgan White |
PPA signed with RainSplitter Wind Farm in Nov 2016 |
3,921.71 | Jun 30 2016 | Sarthak Prasad |
Production started at the Wassaja and Solar Farm |
20,064.22 | Jun 30 2015 | Morgan White |
bought 20,000 RECs |
67.39 | Jun 30 2014 | Sarthak Prasad |
Production started at BRC |
40.98 | Jun 30 2013 | Sarthak Prasad | |
41.35 | Jun 30 2012 | Sarthak Prasad | |
43.35 | Jun 30 2011 | Sarthak Prasad | |
43.37 | Jun 30 2010 | Sarthak Prasad | |
12.06 | Jun 30 2009 | Sarthak Prasad |
Production started at BIF |
0.00 | Jun 30 2008 | Sarthak Prasad |
Baseline |
Targets
Year | Target Value |
---|---|
2020 | 120,000.00 |
2025 | 140,000.00 |
Year | Target Value |
---|---|
2025 | 140,000.00 |
Metric Topic
Tracking Date Type
Associated Projects
Key Objective(s)
-
2.3.1 140,000 MWh/yr Clean Power
(iCAP 2020) -
3.3 Expand the Purchase of Clean Energy
(2015 iCAP)