Attached is the EPA GPP Reporting form for FY23.
The iCAP 2020 objective 2.3.1 is to "Use at least 140,000 MWh/year of clean power by FY25." This objective is about clean power, which is different from clean thermal energy. The responsible campus unit for championing this objective is F&S.
As of 2020, there are three types of clean power options being pursued or used on campus.
Baseline
Production started at BIF
Production started at BRC
bought 20,000 RECs
Production started at the Wassaja and Solar Farm
PPA signed with RainSplitter Wind Farm in Nov 2016
Includes thermal renewables at ARC and the Energy Farm, plus wind and solar power
includes first five months of Solar Farm 2.0
Attached is the EPA GPP Reporting form for FY23.
Attached is the summary document for the total RECs retired for UIUC in FY22.