Henry Administration Building
This map is interactive! Click (or touch) and drag to pan; scroll (or pinch) to zoom.
Projects at this location
Project | Description |
---|---|
Indoor Bin Update |
This project will improve the recycling process in buildings around campus by encouraging sustainable actions and improving the layout of waste and recycling bins within these buildings. Facilities & Services collaborated with ISTC to make an “Indoor Solid Waste and Recycling Collection Assessment”. This assessment determined that the type and layout of collection containers in buildings across campus should be standardized. An update would enable them to be co-located and allow for greater infrastructure consistency. |
FY11 RCx |
In FY11, the Retrocommissioning teams completed eight buildings. The Facilities & Services Retrocommissioning Team at the University of Illinois received the 2011 Illinois Governor’s Sustainability Award at a ceremony on Thursday, October 27, 2011. Established in 1987, this award has been presented to both public and private organizations that have achieved significant progress on projects designed to protect the environment and improve sustainability within the State of Illinois. |
Waste Stream Characterization Study Phase 1 |
F&S has requested a proposal from the Illinois Sustainable Technology Center (ISTC) to get waste stream audits for select buildings across campus. The program will repeat the efforts completed by ISTC at their building, on a larger scale. This project could eventually extend to cover all campus facilities, or it could be done at select locations on a recurring basis to measure progress. |
LED Projects 2012 |
Several other LED replacement projects also took place in 2012. In the Krannert Art Museum Gallery (LINK Gallery) renovation, 62 LED fixtures were installed. Track lighting in the Henry Administration was replaced with LEDs. LEDs were also installed in the Illinois Sustainable Technology Center conference room. |
ICECF 2008 Lighting Retrofit [ARCHIVED] |
The ICECF 2008 Lighting Retrofit was the first round of the T-12 to T-8 Lighting Retrofit Project. A total of 52,810 T-12 fixtures were replaced with thinner, more energy effiecient T-8 fixtures. This will incur a total Annual KWh Savings of 8,630,641 hours. Thirty-one university buildings were involved in this round of the project. The total Simple Payback is estimated to be 2.13. |
Energy Conservation Incentive Program (ECIP) |
For many departments on campus, energy and utility costs do not impact research, teaching, or departmental budgets. The academic departments are supplied with utilities through the campus administrative budget. For these departments, an incentive program has been implemented to encourage these units to conserve energy. |
Project Updates
-
6/16/2025See attached the presentation used for the 2025 ECIP Awards Celebration
-
11/18/2024These 2 units were delivered to Noyes 1st floor north and south entry ways 11/12/2024.